Gopen & Swan
Gopen & Swan (1990) re-read (30 min)
In: LABLOOP-W31 Notebook
WEEK 31 · Mon 19 Apr → Sun 25 Apr 2027
UNDERSTAND · PRACTICE · KEEP EVIDENCE
Read the week in plain language, refresh the foundations, follow each challenge step by step, and check what evidence to keep. Includes worked examples, answer keys and prompts for visual study resources.
Use this within your existing weekly blocks. Your learning completion and research evidence remain in your current tracker and week files.
START HERE · 2 MINUTES
STATUS
| Deliverable | Acceptance | State |
|---|---|---|
paper-3-methods-draft.mdBuild create + |
Write introduction and methods from the versioned protein-study protocol, splits, embeddings and any partner assay protocol. Acceptance: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request. | |
paper-3-results-draft.mdBuild create + |
Write results/limitations from frozen tables, include negative results, and run a skeptical methods review. Acceptance: No computational candidate is described as wet-lab validated without evidence. | |
coauthor-review-package.mdBuild create + |
Prepare the complete manuscript, contribution statement and question list for every proposed author and the lab reviewer. Acceptance: Review requests and returned author decisions are separately tracked. | |
study-notes.mdLearning create + |
Selected exact free resources; bounded lesson/exercise; separate solution; quiz and grading rubric; Peter's answers and gaps when executed | |
founder-paper.mdFounder papers create + |
Verified source and P11 digest; authentic question and connection sentence; access limitations | |
branding-pack.mdBranding create + |
Wednesday note, Sunday build log, X adaptation, figure/caption/alt text and the week's special asset; each claim linked to real proof | |
opportunity-actions.mdOpportunities create + |
Qualified target/role, source/date, ladder stage, next action, message/interview/proposal draft and actual status | |
evidence.mdEvidence & review open & edit ↗ |
Actual paths/URLs, versions, checks/metrics, preparation versus execution state and external receipts when applicable | |
review.mdEvidence & review open & edit ↗ |
Checklist, learning assessment, gate status, shortfalls, next actions and carryover |
These filenames are outputs to prepare during this week's execution; this scaffold does not claim they already exist. Drafts and measured results have different states. Technical code/data stay in the canonical project repository and are referenced from these coordinating files.
During preparation, future measured tables get column definitions, input requirements and run instructions with PENDING status. During execution, replace pending values only with measured outputs. Do not create realistic-looking fake evidence.
600 MINUTES MAXIMUM
Target. Write introduction and methods from the versioned protein-study protocol, splits, embeddings and any partner assay protocol. Stop when: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request.
No material for Monday — this is a pure build day. Need something to study instead? →
Target. Review the research-writing checklist and one closely related protein study's methods/limitations. Produce: One concise applied note, a worked decision/example and unresolved questions.
Do these in this order — the plan's own sequence:
Target. Write results/limitations from frozen tables, include negative results, and run a skeptical methods review. Stop when: No computational candidate is described as wet-lab validated without evidence. Reserve the last 10 minutes for the optional Wednesday note.
No material for Wednesday — this is a pure build day. Need something to study instead? →
Target. Work through model/human review issues and co-author questions; retain 30 minutes for a directly relevant paper. Apply the Half 2 one-formal-study-block rule.
No material for Thursday — this is a pure build day. Need something to study instead? →
Target. Prepare the complete manuscript, contribution statement and question list for every proposed author and the lab reviewer. Stop when: Review requests and returned author decisions are separately tracked.
No material for Friday — this is a pure build day. Need something to study instead? →
Target. Resolve the earliest critical spillover or dependency. Prepare any long-form publication draft from existing figures here if needed. Sandbox only after commitments are met.
Optional, only if the day went well:
Target. 20 min build-log draft/publication when authorized; 5 min evidence/checklist; 20 min source-grounded gap review; 15 min next week's six physical actions.
No material for Sunday — this is a pure build day. Need something to study instead? →
Spare pockets, repo exercises and anything the plan lists without a day. Take them in this order when a day finishes early.
The model must turn these into exact physical actions using the observed files and available inputs. Each 90-minute block includes start/stop rituals. All calls, posts, debugging, reading and exercises consume this same capacity.
Half 2: Tuesday is the formal study block unless this is a selling/submission/decision week. Thursday supports applied review, partner work or the market task; do not add another full course.
WHAT TO WATCH, READ AND RUN
Writing with a co-author is like cooking in someone else's kitchen: you bring your recipe, they know where everything is, and the dish is better when you respect their habits. Your partner knows what biologists expect in a validation section, which claims will embarrass them in front of peers, and which journals their community reads. You know how to make every number reproducible. This week you use the same writing…
0 of 8 finished · give me one to start now → · open in the deck →
In the plan's running order: each card says which block it belongs to and what has to come before it. The seven-day plan lists the same cards under the day that owns them.
Gopen & Swan (1990) re-read (30 min)
In: LABLOOP-W31 Notebook
Tuesday · after Gopen & Swan
Coursera Writing in the Sciences (Stanford), module on "Discussion" and "Abstract" (45 min)
In: LABLOOP-W31 Notebook
Saturday sandbox
Target journal author guidelines chosen with the partner (e.g., a protein engineering or applied microbiology journal; verify fit and open-access policy)
In: LABLOOP-W31 Notebook
Saturday sandbox · after Target journal author guidelines chosen with the partner
Stanford CS197 lecture on co-authoring and feedback (verify)
In: LABLOOP-W31 Notebook
Saturday sandbox · after Stanford CS197 lecture on co-authoring and feedback
Whitesides 2004 (carry over)
In: LABLOOP-W31 Notebook
Paper 3 manuscript; export to .docx for a co-author who uses Word track changes
In: LABLOOP-W31 Notebook
make paper from a clean clone; tag paper-3-draft-1
In: LABLOOP-W31 Notebook
Check the Discussion's claims about prior work against the PDFs you cite (verify manually)
In: LABLOOP-W31 Notebook
READ FIRST
This week delivers the three concrete artifacts below and the supporting learning/branding/opportunity pack. The scientific or commercial outcome follows the preserved source brief, while the acceptance checks make its evidence testable. The career objective is to turn this work into something a scientist, hiring manager or buyer can inspect.
READ FIRST
Read v6 · Week 31 · Write Paper 3 before Monday. It expands this week's one-row v5 brief into daily build steps and adds the Welcome analogy, Learn it (▶ core and + deeper sources), Run it (repos with a 20-40 minute exercise), the NotebookLM kit and the mentor check below. Standing v6 rules: resource rules, NotebookLM protocol, chapter anatomy. v6 adds depth only; it does not change a goal, gate, output or the 600-minute cap, so this specification still governs execution.
Act VI · Threads: EL, R · Next gate: 32
Where this week sits. - ← From: weeks 21-30 (model, candidates, validation); weeks 14-18 writing craft. - → Feeds: week 32 (preprint), week 36 (journal choice), week 38 (talk), Part 9 headline ("co-author with [lab]"). - ⟳ Returns in: the relationship: co-authors refer clients, students and future papers.
Goals. - 🎯 This week: Paper 3 draft with co-author comments incorporated; P10 run; co-author's lab has read it. - 🏁 Next milestone: Gate 32. - 🌟 Final: L4 co-authored.
The plan (from v5 Part 7, expanded; gate and output unchanged).
v5 row: 31 | Write Paper 3 | Research craft refresher | Draft with co-author; Prompt P10; co-author's lab reads it | Draft to co-author - Goal: a draft both authors are proud of. - Tue (study): research craft refresher (Gopen & Swan re-read; Writing in the Sciences module on discussion sections). - Build: Mon: skeleton (P9) with the partner's section preferences; Methods (computational) by you, Methods (wet lab) by the partner. Wed: Results and Discussion draft; P10 twice. Fri: draft to co-author; CRediT statement; data and code availability agreed. - Sun: no public post about unpublished results. - Only one thing: draft sent to the co-author.
Mentor check. "A biologist and I wrote the same paper, and both of us would defend every sentence."
OPEN WHEN NEEDED
READ FIRST
Material: Review the research-writing checklist and one closely related protein study's methods/limitations.
Produce: One concise applied note, a worked decision/example and unresolved questions.
Understanding check: The note directly supports this week's experiment, collaboration, delivery or career action.
During preparation, write one worked example connected to the week's actual task, one exercise with a separate answer key and five questions. Peter supplies answers; score explanation quality and flag misconceptions in QUESTIONS. Numeric/scientific conclusions require actual data or explicitly synthetic teaching values.
Material: Work through model/human review issues and co-author questions; retain 30 minutes for a directly relevant paper.
Produce: One concise applied note, a worked decision/example and unresolved questions.
Understanding check: The note directly supports this week's experiment, collaboration, delivery or career action.
Use the prompt pack: P1 explanation ladder, P2 concept-to-project bridge and P3 quiz. Coding practice belongs within the allocated study/build block. Where the source asks for a favorable scientific result, substitute an honest measured comparison as explained below.
Select one verified founder/scientific-lead paper relevant to this week's domain. Use P11; save the question, method, numerical result with context, data workflow, three author questions and one connection sentence in founder-paper.md. Keep abstract-only access limitations explicit. On source weeks with no study, prioritize the commercial/submission task and log any skipped digest.
OPEN WHEN NEEDED
Branding: Prepare a writing-process note and an evidence-backed protein-ML portfolio bullet.
Opportunity action: Update qualified hiring contacts on concrete work; prepare co-author review requests and close audit acceptance issues.
Use career asset contracts. Publish at most the agreed cadence; one figure and one supported number or admitted failure can support multiple drafts. In long-form weeks, prepare a 1,500–2,500-word article from existing evidence within the build/buffer allocation. In release/demo weeks, prepare a 60-second script: problem, input, command/action, result, limitation and proof link.
Verify individuals, jobs and affiliations at execution time. The GridX list and v4 company map are research seeds, not current facts. Do not reveal named company weaknesses or employer/client confidential information. Keep drafted/sent/replied/booked/held statuses separate. The planning request alone does not authorize external messages or publication; honor explicit authorization in the execution session.
OPEN WHEN NEEDED
Without a contributing scientist, prepare a computational manuscript and disclose the missed co-authorship gate. Models cannot supply human authorship or approval.
Apply the root scientific evidence contract: provenance; meaningful independent splits; no future-data leakage; baseline comparison; actual denominators/uncertainty; failed cases; human review where required. State whether data are simulated, public experimental, synthetic or partner-provided.
Keep source gates intact, and log scope/time conflicts in review. Missing people, money, access or results must not be replaced with invented evidence. Reduce optional polish first. A specific essential external dependency stays pending while independent preparation continues.
READ FIRST
This is an enabling week. Its deliverables feed the next scheduled gate: 32. Complete the acceptance checklist below; do not promote reputation from a draft.
READ FIRST
Expanded minimum derived from the source goal: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request.
Operational first step if stalled: open paper-3-methods-draft.md, write the required inputs and produce the smallest checkable example in ten minutes. If a more urgent missing gate dependency controls the week, use the source minimum above.
If the full week does not fit, use P14: retain one gate-critical deliverable and one directly supporting study exercise; record what is skipped versus moved. Do not mark the original full gate passed merely because the minimum was completed. After a missed week, reforecast from actual evidence and avoid a second unexamined lost week.
OPEN WHEN NEEDED
In review, state exactly what exists, what was verified, what Peter can now explain, which external events remain pending, where the canonical code/data live, and the next file/function or draft paragraph to touch. Link each fact to evidence. Carry scientific assumptions, split definitions and rights constraints forward explicitly.
OPEN WHEN NEEDED
Prepare Week 31 of this LABLOOP execution plan.
Read execution-plan/specs.md, execution-plan/DECISIONS.md,
execution-plan/GATES.md and
execution-plan/weeks/week-31-paper-3-coauthor-draft/specs.md, commitment.md, evidence.md and review.md.
Read prior prerequisite reviews and inspect actual repository/data state.
Use v5 as the governing sequence, the v6 Week 31 chapter
(LABLOOP-Master-Plan-v6.md) as the deeper walkthrough, and v4 only for
retained details.
Produce the full local preparation pack and the exact week-specific files named
in the artifact table. Give me a bounded lesson with exercises/answer key,
daily physical actions, technical runbook or draft, branding drafts and
career/commercial actions. Keep the total to 600 minutes.
Separate prepared artifacts from measured results and my learning completion.
Verify sources and do not invent metrics, citations, papers, people or outcomes.
Do not execute external communications, publication or spending unless the
current session already authorizes the specific action.
Finish by updating evidence/review and TODAY with the next physical action.
OPEN WHEN NEEDED
v6 expands this row into a full brief, with the gate and output unchanged, inside v6 · Week 31 · Write Paper 3. The following is source planning text, not a claim of completion. Apply the explicit evidence corrections in this specification and DECISIONS.md.
| Week | Goal | Study (Tue) | Build (Mon/Wed/Fri) | Output |
|---|---|---|---|---|
| 31 | Write Paper 3 | Research craft refresher | Draft with co-author; Prompt P10; co-author's lab reads it | Draft to co-author |
WEEK FILES
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: paper 3 coauthor draft. Minimum that keeps the next gate alive: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request.
paper-3-methods-draft.md: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request.paper-3-results-draft.md: No computational candidate is described as wet-lab validated without evidence.coauthor-review-package.md: Review requests and returned author decisions are separately tracked.| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Write introduction and methods from the versioned protein-study protocol, splits, embeddings and any partner assay protocol. | Not set | ☐ |
| Tue | 90 | One concise applied note, a worked decision/example and unresolved questions. | Not set | ☐ |
| Wed | 90 | Write results/limitations from frozen tables, include negative results, and run a skeptical methods review. Last ten minutes: optional note. | Not set | ☐ |
| Thu | 90 | One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. | Not set | ☐ |
| Fri | 90 | Prepare the complete manuscript, contribution statement and question list for every proposed author and the lab reviewer. | Not set | ☐ |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | ☐ |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | ☐ |
Peter's commitment / adjustments: pending. Reviewing model and date: pending.
Execution state: NOT_STARTED. Specification This file is a blank register with planned artifact names; none of the rows prove completion.
| Item | Path / URL / version | State | Verification / actual result | Verified by / date |
|---|---|---|---|---|
| paper-3-methods-draft.md | Not created | NOT_STARTED | Pending: The exact target quantity and experimental/computational scope are explicit. | — |
| paper-3-results-draft.md | Not created | NOT_STARTED | Pending: No computational candidate is described as wet-lab validated without evidence. | — |
| coauthor-review-package.md | Not created | NOT_STARTED | Pending: Review requests and returned author decisions are separately tracked. | — |
| Learning exercise / Peter's quiz | Not created | NOT_STARTED | Peter's actual answers required | — |
| Founder paper digest | Not created | NOT_STARTED | Source/content and access checked | — |
| Branding pack | Not created | NOT_STARTED | Claims audited; drafted/public status distinct | — |
| Opportunity actions | Not created | NOT_STARTED | Drafted/sent/replied/booked/held distinct | — |
| Question / metric | Dataset, N and unit | Split / seed / config | Command or verification method | Output path and measured value | Uncertainty / limitation |
|---|---|---|---|---|---|
| Date | Action / counterpart | Receipt or private reference | State | Next action / date |
|---|---|---|---|---|
Peter's teach-back / quiz score: not assessed. Scientific assumptions and deviations: none recorded yet. Budget allocated / spent: not assessed / no spend recorded. Missing evidence and responsible owner: pending inspection.
Do not put API keys, source full texts with restricted rights, client data or invoice personal details in a public version of this register. Keep private evidence references private.
Review status: NOT_REVIEWED. Specification · Evidence
What Peter can explain or reproduce now: not assessed. Quiz / teach-back gaps: not assessed. Measured result and limitations: pending. Best evidence link for a scientist/recruiter/buyer: pending. What failed or changed, and why: pending.
Gate requirement: No standalone gate; check this week's acceptance criteria and next gate dependencies. Gate status: NOT_STARTED. Original target week: See next gate in specs. Actual completion date / forecast: not set. Missing external evidence: pending inspection. Blocks completed / 7: not recorded. Days with commits / 7: not recorded. Sunday build log / optional Wednesday note: not recorded. Founder conversations cumulative: not recorded. Earned evidence level and proof: not assessed. Consecutive lost weeks: not assessed.
Week-specific risk to revisit: Without a contributing scientist, prepare a computational manuscript and disclose the missed co-authorship gate. Models cannot supply human authorship or approval.
Continue / recover / blocked: not decided. Retain as the minimum: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request. Skipped permanently with reason: none recorded. Carryover with owner, dependency and target week: none recorded. Canonical repository paths and versions: pending. Data permissions, split definitions or assumptions to preserve: pending. External action authorization that still applies: not assessed. Next physical action, exact file/function/paragraph: pending. Updates to root PROGRESS / LOG / TODAY completed: ☐
YOUR SPACE