execution-plan/weeks/week-31-paper-3-coauthor-draft/commitment.md

execution-plan/weeks/week-31-paper-3-coauthor-draft/commitment.md Β· UPDATED 2026-09-16

Week 31 commitment

3 parts428 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: paper 3 coauthor draft. Minimum that keeps the next gate alive: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request.

01

01

Deliverables to commit

  • paper-3-methods-draft.md: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request.
  • paper-3-results-draft.md: No computational candidate is described as wet-lab validated without evidence.
  • coauthor-review-package.md: Review requests and returned author decisions are separately tracked.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Write introduction and methods from the versioned protein-study protocol, splits, embeddings and any partner assay protocol. Not set [ ]
Tue 90 One concise applied note, a worked decision/example and unresolved questions. Not set [ ]
Wed 90 Write results/limitations from frozen tables, include negative results, and run a skeptical methods review. Last ten minutes: optional note. Not set [ ]
Thu 90 One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Prepare the complete manuscript, contribution statement and question list for every proposed author and the lab reviewer. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Without a contributing scientist, prepare a computational manuscript and disclose the missed co-authorship gate. Models cannot supply human authorship or approval.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.

↑ Back to top
⏱ Focus Focus25:00 0 min today