Week 31 commitment
3 parts428 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: paper 3 coauthor draft. Minimum that keeps the next gate alive: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request.
0101
Deliverables to commit
01
Deliverables to commit
-
paper-3-methods-draft.md: Produce Paper 3 methods/results draft from actual evidence and prepare the co-author review request. -
paper-3-results-draft.md: No computational candidate is described as wet-lab validated without evidence. -
coauthor-review-package.md: Review requests and returned author decisions are separately tracked. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Write introduction and methods from the versioned protein-study protocol, splits, embeddings and any partner assay protocol. | Not set | [ ] |
| Tue | 90 | One concise applied note, a worked decision/example and unresolved questions. | Not set | [ ] |
| Wed | 90 | Write results/limitations from frozen tables, include negative results, and run a skeptical methods review. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Prepare the complete manuscript, contribution statement and question list for every proposed author and the lab reviewer. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Without a contributing scientist, prepare a computational manuscript and disclose the missed co-authorship gate. Models cannot supply human authorship or approval.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.