execution-plan/weeks/week-32-paper-3-gate-and-career-refresh/specs.md Β· UPDATED 2026-10-01
Week 32 β paper 3 gate and career refresh
Full learning notebook: explanations, step-by-step challenges, stashes and evidence Β· NotebookLM export
Status: NOT_STARTED. Calendar dates: not assigned. Owner: Peter Ciancaglini. Planning authority: v5 Part 7 with retained v4 details. Deeper walkthrough: v6 Β· Week 32 Β· GATE 32: Paper 3 preprint (L4 co-authored). Active project/repository: enzymelens; portfolio; commercial materials.
Programme Β· Model instructions Β· Decisions Β· Resources Β· v6 walkthrough Β· Previous week review Β· Next week
0101
Outcome and relevance
01
Outcome and relevance
This week delivers the three concrete artifacts below and the supporting learning/branding/opportunity pack. The scientific or commercial outcome follows the preserved source brief, while the acceptance checks make its evidence testable. The career objective is to turn this work into something a scientist, hiring manager or buyer can inspect.
- Scientific/build priority: Resolve author review and verify venue requirements; prepare/submit Paper 3 with truthful contributions and data availability.
- Public/profile priority: Prepare X3 launch assets and a consented case-study version; update scientific bio and featured links.
- Career/relationship/commercial priority: Revisit the verified employer shortlist and recruiter contacts with new evidence; track employment and client funnels separately.
0202
Deeper walkthrough (v6)
02
Deeper walkthrough (v6)
Read v6 Β· Week 32 Β· GATE 32: Paper 3 preprint (L4 co-authored) before Monday. It expands this week's one-row v5 brief into daily build steps and adds the Welcome analogy, Learn it (βΆ core and οΌ deeper sources), Run it (repos with a 20-40 minute exercise), the NotebookLM kit and the mentor check below. Standing v6 rules: resource rules, NotebookLM protocol, chapter anatomy. v6 adds depth only; it does not change a goal, gate, output or the 600-minute cap, so this specification still governs execution.
Act VI (finale) Β· Threads: EL, $, R Β· GATE 32
Where this week sits. - β From: Acts V and VI. - β Feeds: week 36 (journal decisions), week 37 (pilot or job), week 38 (talk), week 39 (fund package), week 40 (decision). - β³ Returns in: every introduction from now on: "co-author with [lab]".
Goals. - π― This week: Paper 3 on bioRxiv with co-author; case study published with permission; second audit or pilot proposal sent; career assets refreshed. - π This gate (32): L4 co-authored. - π Final: L5 reviewed and invited (weeks 36-40).
The plan (from v5 Part 7, expanded; gate and output unchanged).
v5 row: 32 | GATE 32: Paper 3 preprint (L4 co-authored) | none | bioRxiv submission with co-author; second audit or pilot proposal sent | X3. Case study published with client permission - Goal: X3 exists and the practice has a second opportunity in motion. - Build: [ ] Mon: final co-author sign-off; bioRxiv submission; code/data DOIs. [ ] Wed: case study published (LinkedIn article + site); second audit or pilot proposal sent to the week 29 client or the best week 27 prospect. [ ] Fri: headline and site updated; 5 new applications or fractional-role conversations with three preprints (Part 9.4). - Sun: L-Sun: the preprint, credited to both authors. X3. Gauge: L4 (co-authored). - Gate 32 passes when: bioRxiv DOI with co-author exists. - Only one thing: the submission.
Mentor check. "I am a co-author with a scientist and a paid consultant with a public case study."
0303
Required inputs and dependency check
03
Required inputs and dependency check
- Week 31: inspect its actual evidence and review; source/code artifacts must exist before the dependent task begins.
- Read commitment, evidence, review and the current root TODAY/PROGRESS/QUESTIONS files.
- Read this week's chapter, v6 Β· Week 32 Β· GATE 32: Paper 3 preprint (L4 co-authored), then the standing sections: Part 0 Β· how to use the document, Part 3 Β· the scientific thesis, Part 4 Β· curriculum, Part 8 Β· the prompt pack and Part 9 Β· branding and endorsement. The same sections exist in the v5 master, which remains the governing sequence; v6 reproduces them and adds depth. Retained commercial/instrument details come from v4.
- Inspect the actual canonical repository state, available data, existing figures and required human/external inputs. Never assume a previous week succeeded from its folder name.
- Verify current resource links, versions, dataset rights and any live company/venue information before relying on them. Use source catalog; explicitly record inaccessible resources.
0404
Seven-day plan: 600 minutes maximum
04
Seven-day plan: 600 minutes maximum
The model must turn these into exact physical actions using the observed files and available inputs. Each 90-minute block includes start/stop rituals. All calls, posts, debugging, reading and exercises consume this same capacity.
| Day | Budget | Work and stopping condition |
|---|---|---|
| Monday | 90 min | Resolve author review and verify venue requirements; prepare/submit Paper 3 with truthful contributions and data availability. Stop when: Complete an author-approved Paper 3 submission package and submit when authorized; keep public/co-authored gate status pending until its evidence exists. |
| Tuesday | 90 min | No new coursework. Use the block for author review closure and submission metadata. Produce: One concise applied note, a worked decision/example and unresolved questions. |
| Wednesday | 90 min | Prepare a second audit or pilot proposal based on measured client needs, with capacity and acceptance criteria. Stop when: Evidence, buyer, scope, fee hypothesis, timeline and next decision are explicit. Reserve the last 10 minutes for the optional Wednesday note. |
| Thursday | 90 min | Use the block for case-study permission handling and evidence-based application refresh; no additional curriculum. Apply the Half 2 one-formal-study-block rule. |
| Friday | 90 min | Refresh CV/portfolio/application materials and finalize the case study for publication only with client permission. Stop when: Three-paper claims match public status; actual application/resubmission actions are logged. |
| Saturday | 90 min | Resolve the earliest critical spillover or dependency. Prepare any long-form publication draft from existing figures here if needed. Sandbox only after commitments are met. |
| Sunday | 60 min | 20 min build-log draft/publication when authorized; 5 min evidence/checklist; 20 min source-grounded gap review; 15 min next week's six physical actions. |
Half 2: Tuesday is the formal study block unless this is a selling/submission/decision week. Thursday supports applied review, partner work or the market task; do not add another full course.
0505
Learning specification
05
Learning specification
Biology/domain unit
Material: No new coursework. Use the block for author review closure and submission metadata.
Produce: One concise applied note, a worked decision/example and unresolved questions.
Understanding check: The note directly supports this week's experiment, collaboration, delivery or career action.
During preparation, write one worked example connected to the week's actual task, one exercise with a separate answer key and five questions. Peter supplies answers; score explanation quality and flag misconceptions in QUESTIONS. Numeric/scientific conclusions require actual data or explicitly synthetic teaching values.
AI/scientific-method unit
Material: Use the block for case-study permission handling and evidence-based application refresh; no additional curriculum.
Produce: One concise applied note, a worked decision/example and unresolved questions.
Understanding check: The note directly supports this week's experiment, collaboration, delivery or career action.
Use the prompt pack: P1 explanation ladder, P2 concept-to-project bridge and P3 quiz. Coding practice belongs within the allocated study/build block. Where the source asks for a favorable scientific result, substitute an honest measured comparison as explained below.
Founder/scientist paper
Select one verified founder/scientific-lead paper relevant to this week's domain. Use P11; save the question, method, numerical result with context, data workflow, three author questions and one connection sentence in founder-paper.md. Keep abstract-only access limitations explicit. On source weeks with no study, prioritize the commercial/submission task and log any skipped digest.
0606
Artifact contracts
06
Artifact contracts
These filenames are outputs to prepare during this week's execution; this scaffold does not claim they already exist. Drafts and measured results have different states. Technical code/data stay in the canonical project repository and are referenced from these coordinating files.
| Artifact | Required content / acceptance | Primary responsibility |
|---|---|---|
paper-3-submission-record.md |
Resolve author review and verify venue requirements; prepare/submit Paper 3 with truthful contributions and data availability. Acceptance: Complete an author-approved Paper 3 submission package and submit when authorized; keep public/co-authored gate status pending until its evidence exists. | Model assists; Peter checks and owns the outcome |
next-engagement-proposal.md |
Prepare a second audit or pilot proposal based on measured client needs, with capacity and acceptance criteria. Acceptance: Evidence, buyer, scope, fee hypothesis, timeline and next decision are explicit. | Model assists; Peter checks and owns the outcome |
career-refresh-pack.md |
Refresh CV/portfolio/application materials and finalize the case study for publication only with client permission. Acceptance: Three-paper claims match public status; actual application/resubmission actions are logged. | Model assists; Peter checks and owns the outcome |
study-notes.md |
Selected exact free resources; bounded lesson/exercise; separate solution; quiz and grading rubric; Peter's answers and gaps when executed | Model prepares; Peter learns |
founder-paper.md |
Verified source and P11 digest; authentic question and connection sentence; access limitations | Model assists; Peter checks |
branding-pack.md |
Wednesday note, Sunday build log, X adaptation, figure/caption/alt text and the week's special asset; each claim linked to real proof | Model drafts; Peter owns voice/public claims |
opportunity-actions.md |
Qualified target/role, source/date, ladder stage, next action, message/interview/proposal draft and actual status | Model prepares; Peter owns external relationships |
evidence.md |
Actual paths/URLs, versions, checks/metrics, preparation versus execution state and external receipts when applicable | Updated after each deliverable |
review.md |
Checklist, learning assessment, gate status, shortfalls, next actions and carryover | Peter and reviewing model |
During preparation, future measured tables get column definitions, input requirements and run instructions with PENDING status. During execution, replace pending values only with measured outputs. Do not create realistic-looking fake evidence.
0707
Branding and opportunity execution brief
07
Branding and opportunity execution brief
Branding: Prepare X3 launch assets and a consented case-study version; update scientific bio and featured links.
Opportunity action: Revisit the verified employer shortlist and recruiter contacts with new evidence; track employment and client funnels separately.
Use career asset contracts. Publish at most the agreed cadence; one figure and one supported number or admitted failure can support multiple drafts. In long-form weeks, prepare a 1,500β2,500-word article from existing evidence within the build/buffer allocation. In release/demo weeks, prepare a 60-second script: problem, input, command/action, result, limitation and proof link.
Verify individuals, jobs and affiliations at execution time. The GridX list and v4 company map are research seeds, not current facts. Do not reveal named company weaknesses or employer/client confidential information. Keep drafted/sent/replied/booked/held statuses separate. The planning request alone does not authorize external messages or publication; honor explicit authorization in the execution session.
0808
Quality risks and week-specific constraints
08
Quality risks and week-specific constraints
A computational-only or pending submission cannot be marked as the source co-authored public-preprint gate. Record shortfalls while progressing the allowed alternative.
Apply the root scientific evidence contract: provenance; meaningful independent splits; no future-data leakage; baseline comparison; actual denominators/uncertainty; failed cases; human review where required. State whether data are simulated, public experimental, synthetic or partner-provided.
Keep source gates intact, and log scope/time conflicts in review. Missing people, money, access or results must not be replaced with invented evidence. Reduce optional polish first. A specific essential external dependency stays pending while independent preparation continues.
0909
Completion and gate review
09
Completion and gate review
This is Gate 32: Paper 3.
Required proof: Public preprint DOI with a contributing scientist as co-author and all authors' approval.
Reputation interpretation: L4-co-authored when public. Record target, forecast, actual date and evidence link. The original gate stays incomplete until the required external proof exists.
- Monday artifact satisfies: Complete an author-approved Paper 3 submission package and submit when authorized; keep public/co-authored gate status pending until its evidence exists.
- Wednesday artifact satisfies: Evidence, buyer, scope, fee hypothesis, timeline and next decision are explicit.
- Friday artifact satisfies: Three-paper claims match public status; actual application/resubmission actions are logged.
- Study pack is prepared; Peter's actual learning/quiz result is recorded separately.
- Branding and opportunity drafts use supported claims and the correct external-action state.
- Reproduction or document checks are recorded with file/version references.
- This week's special gate, if any, has real evidence or remains explicitly pending.
- Review, root progress/log and the next physical action are updated.
1010
Minimum viable week and recovery
10
Minimum viable week and recovery
Expanded minimum derived from the source goal: Complete an author-approved Paper 3 submission package and submit when authorized; keep public/co-authored gate status pending until its evidence exists.
Operational first step if stalled: open paper-3-submission-record.md, write the required inputs and produce the smallest checkable example in ten minutes. If a more urgent missing gate dependency controls the week, use the source minimum above.
If the full week does not fit, use P14: retain one gate-critical deliverable and one directly supporting study exercise; record what is skipped versus moved. Do not mark the original full gate passed merely because the minimum was completed. After a missed week, reforecast from actual evidence and avoid a second unexamined lost week.
1111
Handoff to the next model
11
Handoff to the next model
In review, state exactly what exists, what was verified, what Peter can now explain, which external events remain pending, where the canonical code/data live, and the next file/function or draft paragraph to touch. Link each fact to evidence. Carry scientific assumptions, split definitions and rights constraints forward explicitly.
1212
Ready-to-copy model prompt
12
Ready-to-copy model prompt
Prepare Week 32 of this LABLOOP execution plan.
Read execution-plan/specs.md, execution-plan/DECISIONS.md,
execution-plan/GATES.md and
execution-plan/weeks/week-32-paper-3-gate-and-career-refresh/specs.md, commitment.md, evidence.md and review.md.
Read prior prerequisite reviews and inspect actual repository/data state.
Use v5 as the governing sequence, the v6 Week 32 chapter
(LABLOOP-Master-Plan-v6.md) as the deeper walkthrough, and v4 only for
retained details.
Produce the full local preparation pack and the exact week-specific files named
in the artifact table. Give me a bounded lesson with exercises/answer key,
daily physical actions, technical runbook or draft, branding drafts and
career/commercial actions. Keep the total to 600 minutes.
Separate prepared artifacts from measured results and my learning completion.
Verify sources and do not invent metrics, citations, papers, people or outcomes.
Do not execute external communications, publication or spending unless the
current session already authorizes the specific action.
Finish by updating evidence/review and TODAY with the next physical action.
1313
Preserved original v5 weekly brief
13
Preserved original v5 weekly brief
v6 expands this row into a full brief, with the gate and output unchanged, inside v6 Β· Week 32 Β· GATE 32: Paper 3 preprint (L4 co-authored). The following is source planning text, not a claim of completion. Apply the explicit evidence corrections in this specification and DECISIONS.md.
| Week | Goal | Study (Tue) | Build (Mon/Wed/Fri) | Output |
|---|---|---|---|---|
| 32 | GATE 32: Paper 3 preprint (L4 co-authored) | none | bioRxiv submission with co-author; second audit or pilot proposal sent | X3. Case study published with client permission |