Nancy Duarte, "The secret structure of great talks"
Saturday sandbox
Nancy Duarte, "The secret structure of great talks" (TEDx, YouTube)
In: LABLOOP-W38 Notebook
WEEK 38 · Mon 07 Jun → Sun 13 Jun 2027
UNDERSTAND · PRACTICE · KEEP EVIDENCE
Read the week in plain language, refresh the foundations, follow each challenge step by step, and check what evidence to keep. Includes worked examples, answer keys and prompts for visual study resources.
Use this within your existing weekly blocks. Your learning completion and research evidence remain in your current tracker and week files.
START HERE · 2 MINUTES
STATUS
| Deliverable | Acceptance | State |
|---|---|---|
talk-outline.mdBuild create + |
Verify event invitation/date/format and audience; assemble a 20-minute talk around the question, method, measured results and limitations. Acceptance: Deliver the agreed scientific talk if scheduled; otherwise finish the timed rehearsal and ready event/seminar package while retaining the delivery shortfall. | |
talk-rehearsal.mdBuild create + |
Rehearse and record with a five-question scientific challenge; cut slides to fit time and prepare Q&A on simulation, leakage and generalization. Acceptance: A timed rehearsal and answers to likely objections exist. | |
talk-delivery-record.mdBuild create + |
Deliver at the agreed event and prepare recording/slides for publication with relevant permission; track actual attendance/invitation evidence. Acceptance: Delivered talk is distinguished from proposal and self-recording. | |
study-notes.mdLearning create + |
Selected exact free resources; bounded lesson/exercise; separate solution; quiz and grading rubric; Peter's answers and gaps when executed | |
founder-paper.mdFounder papers create + |
Verified source and P11 digest; authentic question and connection sentence; access limitations | |
branding-pack.mdBranding create + |
Wednesday note, Sunday build log, X adaptation, figure/caption/alt text and the week's special asset; each claim linked to real proof | |
opportunity-actions.mdOpportunities create + |
Qualified target/role, source/date, ladder stage, next action, message/interview/proposal draft and actual status | |
evidence.mdEvidence & review open & edit ↗ |
Actual paths/URLs, versions, checks/metrics, preparation versus execution state and external receipts when applicable | |
review.mdEvidence & review open & edit ↗ |
Checklist, learning assessment, gate status, shortfalls, next actions and carryover |
These filenames are outputs to prepare during this week's execution; this scaffold does not claim they already exist. Drafts and measured results have different states. Technical code/data stay in the canonical project repository and are referenced from these coordinating files.
During preparation, future measured tables get column definitions, input requirements and run instructions with PENDING status. During execution, replace pending values only with measured outputs. Do not create realistic-looking fake evidence.
600 MINUTES MAXIMUM
Target. Verify event invitation/date/format and audience; assemble a 20-minute talk around the question, method, measured results and limitations. Stop when: Deliver the agreed scientific talk if scheduled; otherwise finish the timed rehearsal and ready event/seminar package while retaining the delivery shortfall.
No material for Monday — this is a pure build day. Need something to study instead? →
Target. Review audience prerequisites and rehearse the talk's biological explanation; answer five difficult questions aloud. Produce: One concise applied note, a worked decision/example and unresolved questions.
No material for Tuesday — this is a pure build day. Need something to study instead? →
Target. Rehearse and record with a five-question scientific challenge; cut slides to fit time and prepare Q&A on simulation, leakage and generalization. Stop when: A timed rehearsal and answers to likely objections exist. Reserve the last 10 minutes for the optional Wednesday note.
No material for Wednesday — this is a pure build day. Need something to study instead? →
Target. Timed talk rehearsal and evidence audit; last 30 minutes: an audience-relevant paper or organizer's scientific theme. Apply the Half 2 one-formal-study-block rule.
No material for Thursday — this is a pure build day. Need something to study instead? →
Target. Deliver at the agreed event and prepare recording/slides for publication with relevant permission; track actual attendance/invitation evidence. Stop when: Delivered talk is distinguished from proposal and self-recording.
No material for Friday — this is a pure build day. Need something to study instead? →
Target. Resolve the earliest critical spillover or dependency. Prepare any long-form publication draft from existing figures here if needed. Sandbox only after commitments are met.
Optional, only if the day went well:
Target. 20 min build-log draft/publication when authorized; 5 min evidence/checklist; 20 min source-grounded gap review; 15 min next week's six physical actions.
No material for Sunday — this is a pure build day. Need something to study instead? →
Spare pockets, repo exercises and anything the plan lists without a day. Take them in this order when a day finishes early.
The model must turn these into exact physical actions using the observed files and available inputs. Each 90-minute block includes start/stop rituals. All calls, posts, debugging, reading and exercises consume this same capacity.
Half 2: Tuesday is the formal study block unless this is a selling/submission/decision week. Thursday supports applied review, partner work or the market task; do not add another full course.
WHAT TO WATCH, READ AND RUN
Scientists often learn more about a researcher from a 20-minute talk than from their papers, because a talk shows how you think when there is no edit button. Patrick Winston's rule is the one to carry: start with an empowerment promise ("by the end you will know..."), cycle back to the key idea several times, and end with a contribution, not "thank you, questions?". Your talk, proposed in week 20, tells one story: t…
0 of 6 finished · give me one to start now → · open in the deck →
In the plan's running order: each card says which block it belongs to and what has to come before it. The seven-day plan lists the same cards under the day that owns them.
Saturday sandbox
Nancy Duarte, "The secret structure of great talks" (TEDx, YouTube)
In: LABLOOP-W38 Notebook
Saturday sandbox · after Nancy Duarte, "The secret structure of great talks"
Coursera Introduction to Public Speaking (University of Washington), weeks 2-3
In: LABLOOP-W38 Notebook
Patrick Winston, "How to Speak" (MIT OCW / YouTube, ~1 h; re-watch the first 30 min)
In: LABLOOP-W38 Notebook
Simon Peyton Jones, "How to give a great research talk" (Microsoft Research, YouTube)
In: LABLOOP-W38 Notebook
One live demo cell (the learning-curve slider) as the talk's "wow" moment; have a screenshot fallback
In: LABLOOP-W38 Notebook
Optional reveal.js slides from Markdown so figures regenerate from code
In: LABLOOP-W38 Notebook
READ FIRST
This week delivers the three concrete artifacts below and the supporting learning/branding/opportunity pack. The scientific or commercial outcome follows the preserved source brief, while the acceptance checks make its evidence testable. The career objective is to turn this work into something a scientist, hiring manager or buyer can inspect.
READ FIRST
Read v6 · Week 38 · Talk delivered before Monday. It expands this week's one-row v5 brief into daily build steps and adds the Welcome analogy, Learn it (▶ core and + deeper sources), Run it (repos with a 20-40 minute exercise), the NotebookLM kit and the mentor check below. Standing v6 rules: resource rules, NotebookLM protocol, chapter anatomy. v6 adds depth only; it does not change a goal, gate, output or the 600-minute cap, so this specification still governs execution.
Act VIII · Threads: R · Next gate: 40
Where this week sits. - ← From: week 20 proposal, all three papers, instruments, case study. - → Feeds: week 39 (fund package credibility), week 40 (L5 invited), future invitations. - ⟳ Returns in: every conference invitation after this one.
Goals. - 🎯 This week: 20-minute talk delivered; video posted. - 🏁 Next milestone: Gate 40. - 🌟 Final: L5 "invited".
The plan (from v5 Part 7, expanded; gate and output unchanged).
v5 row: 38 | Talk delivered | Talk rehearsal (Prompt P3) | 20-minute talk at the event accepted in week 20 | Video posted - Goal: the talk happens and exists as a video. - Tue (study): rehearsal with P3 (audience persona: mixed biotech founders and scientists). - Build: Mon: slide deck from the NotebookLM Slide Deck draft, rewritten by you: one idea per slide, figures from the papers. Wed: two timed rehearsals, recorded; cut to 18 minutes. Fri (or event day): deliver; collect three contacts and one question you could not answer (it goes to
PARKING.mdas Half 3 seed). - Sun: video posted with a LinkedIn summary. - Only one thing: the talk delivered.
Mentor check. "I stood in front of scientists and founders and explained my work clearly, and there is a video to prove it."
OPEN WHEN NEEDED
READ FIRST
Material: Review audience prerequisites and rehearse the talk's biological explanation; answer five difficult questions aloud.
Produce: One concise applied note, a worked decision/example and unresolved questions.
Understanding check: The note directly supports this week's experiment, collaboration, delivery or career action.
During preparation, write one worked example connected to the week's actual task, one exercise with a separate answer key and five questions. Peter supplies answers; score explanation quality and flag misconceptions in QUESTIONS. Numeric/scientific conclusions require actual data or explicitly synthetic teaching values.
Material: Timed talk rehearsal and evidence audit; last 30 minutes: an audience-relevant paper or organizer's scientific theme.
Produce: One concise applied note, a worked decision/example and unresolved questions.
Understanding check: The note directly supports this week's experiment, collaboration, delivery or career action.
Use the prompt pack: P1 explanation ladder, P2 concept-to-project bridge and P3 quiz. Coding practice belongs within the allocated study/build block. Where the source asks for a favorable scientific result, substitute an honest measured comparison as explained below.
Select one verified founder/scientific-lead paper relevant to this week's domain. Use P11; save the question, method, numerical result with context, data workflow, three author questions and one connection sentence in founder-paper.md. Keep abstract-only access limitations explicit. On source weeks with no study, prioritize the commercial/submission task and log any skipped digest.
OPEN WHEN NEEDED
Branding: Prepare talk announcement, accessible recap, slides and updated portfolio proof.
Opportunity action: Prepare focused follow-ups to engaged attendees/recruiters and maintain ongoing client/interview commitments.
Use career asset contracts. Publish at most the agreed cadence; one figure and one supported number or admitted failure can support multiple drafts. In long-form weeks, prepare a 1,500–2,500-word article from existing evidence within the build/buffer allocation. In release/demo weeks, prepare a 60-second script: problem, input, command/action, result, limitation and proof link.
Verify individuals, jobs and affiliations at execution time. The GridX list and v4 company map are research seeds, not current facts. Do not reveal named company weaknesses or employer/client confidential information. Keep drafted/sent/replied/booked/held statuses separate. The planning request alone does not authorize external messages or publication; honor explicit authorization in the execution session.
OPEN WHEN NEEDED
Submitting a proposal in week 20 does not guarantee acceptance or a week 38 slot. Use an available seminar/webinar if appropriate; a self-recording is useful but does not satisfy an invited-talk claim.
Apply the root scientific evidence contract: provenance; meaningful independent splits; no future-data leakage; baseline comparison; actual denominators/uncertainty; failed cases; human review where required. State whether data are simulated, public experimental, synthetic or partner-provided.
Keep source gates intact, and log scope/time conflicts in review. Missing people, money, access or results must not be replaced with invented evidence. Reduce optional polish first. A specific essential external dependency stays pending while independent preparation continues.
READ FIRST
This is an enabling week. Its deliverables feed the next scheduled gate: 40. Complete the acceptance checklist below; do not promote reputation from a draft.
READ FIRST
Expanded minimum derived from the source goal: Deliver the agreed scientific talk if scheduled; otherwise finish the timed rehearsal and ready event/seminar package while retaining the delivery shortfall.
Operational first step if stalled: open talk-outline.md, write the required inputs and produce the smallest checkable example in ten minutes. If a more urgent missing gate dependency controls the week, use the source minimum above.
If the full week does not fit, use P14: retain one gate-critical deliverable and one directly supporting study exercise; record what is skipped versus moved. Do not mark the original full gate passed merely because the minimum was completed. After a missed week, reforecast from actual evidence and avoid a second unexamined lost week.
OPEN WHEN NEEDED
In review, state exactly what exists, what was verified, what Peter can now explain, which external events remain pending, where the canonical code/data live, and the next file/function or draft paragraph to touch. Link each fact to evidence. Carry scientific assumptions, split definitions and rights constraints forward explicitly.
OPEN WHEN NEEDED
Prepare Week 38 of this LABLOOP execution plan.
Read execution-plan/specs.md, execution-plan/DECISIONS.md,
execution-plan/GATES.md and
execution-plan/weeks/week-38-scientific-talk-and-proof/specs.md, commitment.md, evidence.md and review.md.
Read prior prerequisite reviews and inspect actual repository/data state.
Use v5 as the governing sequence, the v6 Week 38 chapter
(LABLOOP-Master-Plan-v6.md) as the deeper walkthrough, and v4 only for
retained details.
Produce the full local preparation pack and the exact week-specific files named
in the artifact table. Give me a bounded lesson with exercises/answer key,
daily physical actions, technical runbook or draft, branding drafts and
career/commercial actions. Keep the total to 600 minutes.
Separate prepared artifacts from measured results and my learning completion.
Verify sources and do not invent metrics, citations, papers, people or outcomes.
Do not execute external communications, publication or spending unless the
current session already authorizes the specific action.
Finish by updating evidence/review and TODAY with the next physical action.
OPEN WHEN NEEDED
v6 expands this row into a full brief, with the gate and output unchanged, inside v6 · Week 38 · Talk delivered. The following is source planning text, not a claim of completion. Apply the explicit evidence corrections in this specification and DECISIONS.md.
| Week | Goal | Study (Tue) | Build (Mon/Wed/Fri) | Output |
|---|---|---|---|---|
| 38 | Talk delivered | Talk rehearsal (Prompt P3) | 20-minute talk at the event accepted in week 20 | Video posted |
WEEK FILES
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: scientific talk and proof. Minimum that keeps the next gate alive: Deliver the agreed scientific talk if scheduled; otherwise finish the timed rehearsal and ready event/seminar package while retaining the delivery shortfall.
talk-outline.md: Deliver the agreed scientific talk if scheduled; otherwise finish the timed rehearsal and ready event/seminar package while retaining the delivery shortfall.talk-rehearsal.md: A timed rehearsal and answers to likely objections exist.talk-delivery-record.md: Delivered talk is distinguished from proposal and self-recording.| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Verify event invitation/date/format and audience; assemble a 20-minute talk around the question, method, measured results and limitations. | Not set | ☐ |
| Tue | 90 | One concise applied note, a worked decision/example and unresolved questions. | Not set | ☐ |
| Wed | 90 | Rehearse and record with a five-question scientific challenge; cut slides to fit time and prepare Q&A on simulation, leakage and generalization. Last ten minutes: optional note. | Not set | ☐ |
| Thu | 90 | One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. | Not set | ☐ |
| Fri | 90 | Deliver at the agreed event and prepare recording/slides for publication with relevant permission; track actual attendance/invitation evidence. | Not set | ☐ |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | ☐ |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | ☐ |
Peter's commitment / adjustments: pending. Reviewing model and date: pending.
Execution state: NOT_STARTED. Specification This file is a blank register with planned artifact names; none of the rows prove completion.
| Item | Path / URL / version | State | Verification / actual result | Verified by / date |
|---|---|---|---|---|
| talk-outline.md | Not created | NOT_STARTED | Pending: Each scientific claim links to a figure/source and fits the audience. | — |
| talk-rehearsal.md | Not created | NOT_STARTED | Pending: A timed rehearsal and answers to likely objections exist. | — |
| talk-delivery-record.md | Not created | NOT_STARTED | Pending: Delivered talk is distinguished from proposal and self-recording. | — |
| Learning exercise / Peter's quiz | Not created | NOT_STARTED | Peter's actual answers required | — |
| Founder paper digest | Not created | NOT_STARTED | Source/content and access checked | — |
| Branding pack | Not created | NOT_STARTED | Claims audited; drafted/public status distinct | — |
| Opportunity actions | Not created | NOT_STARTED | Drafted/sent/replied/booked/held distinct | — |
| Question / metric | Dataset, N and unit | Split / seed / config | Command or verification method | Output path and measured value | Uncertainty / limitation |
|---|---|---|---|---|---|
| Date | Action / counterpart | Receipt or private reference | State | Next action / date |
|---|---|---|---|---|
Peter's teach-back / quiz score: not assessed. Scientific assumptions and deviations: none recorded yet. Budget allocated / spent: not assessed / no spend recorded. Missing evidence and responsible owner: pending inspection.
Do not put API keys, source full texts with restricted rights, client data or invoice personal details in a public version of this register. Keep private evidence references private.
Review status: NOT_REVIEWED. Specification · Evidence
What Peter can explain or reproduce now: not assessed. Quiz / teach-back gaps: not assessed. Measured result and limitations: pending. Best evidence link for a scientist/recruiter/buyer: pending. What failed or changed, and why: pending.
Gate requirement: No standalone gate; check this week's acceptance criteria and next gate dependencies. Gate status: NOT_STARTED. Original target week: See next gate in specs. Actual completion date / forecast: not set. Missing external evidence: pending inspection. Blocks completed / 7: not recorded. Days with commits / 7: not recorded. Sunday build log / optional Wednesday note: not recorded. Founder conversations cumulative: not recorded. Earned evidence level and proof: not assessed. Consecutive lost weeks: not assessed.
Week-specific risk to revisit: Submitting a proposal in week 20 does not guarantee acceptance or a week 38 slot. Use an available seminar/webinar if appropriate; a self-recording is useful but does not satisfy an invited-talk claim.
Continue / recover / blocked: not decided. Retain as the minimum: Deliver the agreed scientific talk if scheduled; otherwise finish the timed rehearsal and ready event/seminar package while retaining the delivery shortfall. Skipped permanently with reason: none recorded. Carryover with owner, dependency and target week: none recorded. Canonical repository paths and versions: pending. Data permissions, split definitions or assumptions to preserve: pending. External action authorization that still applies: not assessed. Next physical action, exact file/function/paragraph: pending. Updates to root PROGRESS / LOG / TODAY completed: ☐
YOUR SPACE