Read the week in plain language, refresh the foundations, follow each challenge step by step, and check what evidence to keep. Includes worked examples, answer keys and prompts for visual study resources.
Prepare FermLit v0.5 dataset card, permitted export, data/code citation metadata and HF/Zenodo release package. Acceptance: Card, version, actual N, quality metrics and allowed distribution are verified before release.
Assemble Paper 1 skeleton with six figures, contribution claims, methods and availability statements. Acceptance: All six figures have source data/commands; missing results remain visibly unresolved.
Review the skeleton as a skeptical scientist and link each unsupported claim to a correction owner and deadline. Acceptance: No unsupported claim is promoted into a headline; endorsement conversation status is dated.
Checklist, learning assessment, gate status, shortfalls, next actions and carryover
Notes on artifact states
These filenames are outputs to prepare during this week's execution; this scaffold does not claim they already exist. Drafts and measured results have different states. Technical code/data stay in the canonical project repository and are referenced from these coordinating files.
During preparation, future measured tables get column definitions, input requirements and run instructions with PENDING status. During execution, replace pending values only with measured outputs. Do not create realistic-looking fake evidence.
▦
600 MINUTES MAXIMUM
Seven-day plan
Monday90 min· 1 card, 30 min
Target. Prepare FermLit v0.5 dataset card, permitted export, data/code citation metadata and HF/Zenodo release package. Stop when: Card, version, actual N, quality metrics and allowed distribution are verified before release.
ReadEMBL link may move)75 min · after Holmes & Huber, Modern Statistics for Modern Biology, ch. 1 (generative models for discrete data…find ↗
Wednesday90 min
Target. Assemble Paper 1 skeleton with six figures, contribution claims, methods and availability statements. Stop when: All six figures have source data/commands; missing results remain visibly unresolved. Reserve the last 10 minutes for the optional Wednesday note.
Target. von Stosch et al. 2014, "Hybrid semi-parametric modeling in process systems engineering: past, present and future"; Chen et al. 2018, "Neural Ordinary Differential Equations" (abstract + fig. 1 only) Select material/exercise that fits 60 minutes; use the last 30 for the founder paper.
Target. Review the skeleton as a skeptical scientist and link each unsupported claim to a correction owner and deadline. Stop when: No unsupported claim is promoted into a headline; endorsement conversation status is dated.
Target. Resolve the earliest critical spillover or dependency. Prepare any long-form publication draft from existing figures here if needed. Sandbox only after commitments are met.
Target. 20 min build-log draft/publication when authorized; 5 min evidence/checklist; 20 min source-grounded gap review; 15 min next week's six physical actions.
Block ritual: read your next action → start the 90-min timer → open one file. Close: write tomorrow's action and one log line.
Feels pointless? Does today's Done when need it? No → skip it and log it. Yes → let AI do the boring part, you review. Still stuck → the smallest version in 25 minutes. Pulled into a rabbit hole? Write it in Parked thoughts and save it for Saturday.
The model must turn these into exact physical actions using the observed files and available inputs. Each 90-minute block includes start/stop rituals. All calls, posts, debugging, reading and exercises consume this same capacity.
The source lists more material than necessarily fits. Select exact excerpts for the learning objective and park the remainder; no full-course completion requirement.
◎
WHAT TO WATCH, READ AND RUN
Materials for this week
A census office's proudest day is not when the counting ends; it is when the tables go public and a journalist, a mayor and a researcher all use them for different purposes. Today FermLit goes public: dataset on Hugging Face with its card, Zenodo DOI, v0.5 release. Then you do something that feels premature and is actually the professional move: you build the skeleton of Paper 1 before writing a single paragraph of …
In the plan's running order: each card says which block it belongs to and what has to come
before it. The seven-day plan lists the same cards under the day that owns them.
Holmes & Huber, Modern Statistics for Modern Biology, ch. 1 (generative models for discrete data…
Holmes & Huber, Modern Statistics for Modern Biology, ch. 1 (generative models for discrete data) and ch. 2 (statistical modeling) — search "Modern Statistics for Modern Biology Holmes Huber" (free online book
von Stosch et al. (2014), "Hybrid semi-parametric modeling in process systems engineering: past,…
von Stosch et al. (2014), "Hybrid semi-parametric modeling in process systems engineering: past, present and future", Computers & Chemical Engineering 60:86-101 (sections 1-3)
This week delivers the three concrete artifacts below and the supporting learning/branding/opportunity pack. The scientific or commercial outcome follows the preserved source brief, while the acceptance checks make its evidence testable. The career objective is to turn this work into something a scientist, hiring manager or buyer can inspect.
Public/profile priority: Prepare Medium deep dive 3, dataset release post and recruiter-facing one-paragraph evidence summary.
Career/relationship/commercial priority: Follow up on a live endorsement route and prepare feedback requests focused on the dataset's reuse value.
02
READ FIRST
Deeper walkthrough (v6)
Read v6 · Week 13 · GATE 13: FermLit v0.5 public, Paper 1 outlined before Monday. It carries this week's v5 brief unchanged and adds the Welcome analogy, Learn it (▶ core and + deeper sources), Run it (repos with a 20-40 minute exercise), the NotebookLM kit and the mentor check below. Standing v6 rules: resource rules, NotebookLM protocol, chapter anatomy. v6 adds depth only; it does not change a goal, gate, output or the 600-minute cap, so this specification still governs execution.
Act III (finale) · Threads: B, M, FL, R · GATE 13
Where this week sits.
- ← From: Act III weeks 9-12.
- → Feeds: weeks 14-16 (write, review, submit Paper 1), week 16 (founders and funds receive a real link), week 19 (personal site), week 36 (journal version).
- ⟳ Returns in: L6 "used" when someone cites FermLit.
Goals.
- 🎯 This week: HF dataset + card + Zenodo DOI; Paper 1 skeleton with every figure; P10 list of unsupported claims.
- 🏁 This gate (13): dataset public, skeleton complete, one endorsement conversation alive.
- 🌟 Final: Paper 1 and a dataset with a life beyond you.
Mentor check."FermLit has a DOI and a card, and I can pitch Paper 1 in three sentences with three numbers."
03
OPEN WHEN NEEDED
Required inputs and dependency check
Week 10: inspect its actual evidence and review; source/code artifacts must exist before the dependent task begins.
Week 11: inspect its actual evidence and review; source/code artifacts must exist before the dependent task begins.
Week 12: inspect its actual evidence and review; source/code artifacts must exist before the dependent task begins.
Inspect the actual canonical repository state, available data, existing figures and required human/external inputs. Never assume a previous week succeeded from its folder name.
Verify current resource links, versions, dataset rights and any live company/venue information before relying on them. Use source catalog; explicitly record inaccessible resources.
04
READ FIRST
Learning specification
Biology/domain unit
Source unit: B13 · Statistics for biologists I
Material: Modern Statistics for Modern Biology (Holmes & Huber) ch. 1-2 — huber.embl.de/msmb
Produce: Two exercises redone in Python
Understanding check: You know why biologists distrust p-values from n=3
During preparation, write one worked example connected to the week's actual task, one exercise with a separate answer key and five questions. Peter supplies answers; score explanation quality and flag misconceptions in QUESTIONS. Numeric/scientific conclusions require actual data or explicitly synthetic teaching values.
AI/scientific-method unit
Source unit: M13 · Hybrid and scientific ML
Material: von Stosch et al. 2014, "Hybrid semi-parametric modeling in process systems engineering: past, present and future"; Chen et al. 2018, "Neural Ordinary Differential Equations" (abstract + fig. 1 only)
Produce: Hybrid model v0: Monod + GBM residual
Understanding check: You can draw the hybrid architecture
Use the prompt pack: P1 explanation ladder, P2 concept-to-project bridge and P3 quiz. Coding practice belongs within the allocated study/build block. Where the source asks for a favorable scientific result, substitute an honest measured comparison as explained below.
Founder/scientist paper
Select one verified founder/scientific-lead paper relevant to this week's domain. Use P11; save the question, method, numerical result with context, data workflow, three author questions and one connection sentence in founder-paper.md. Keep abstract-only access limitations explicit. On source weeks with no study, prioritize the commercial/submission task and log any skipped digest.
05
OPEN WHEN NEEDED
Branding and opportunity execution brief
Branding: Prepare Medium deep dive 3, dataset release post and recruiter-facing one-paragraph evidence summary.
Opportunity action: Follow up on a live endorsement route and prepare feedback requests focused on the dataset's reuse value.
Use career asset contracts. Publish at most the agreed cadence; one figure and one supported number or admitted failure can support multiple drafts. In long-form weeks, prepare a 1,500–2,500-word article from existing evidence within the build/buffer allocation. In release/demo weeks, prepare a 60-second script: problem, input, command/action, result, limitation and proof link.
Verify individuals, jobs and affiliations at execution time. The GridX list and v4 company map are research seeds, not current facts. Do not reveal named company weaknesses or employer/client confidential information. Keep drafted/sent/replied/booked/held statuses separate. The planning request alone does not authorize external messages or publication; honor explicit authorization in the execution session.
06
OPEN WHEN NEEDED
Quality risks and week-specific constraints
Public dataset plus DOI and outline are the gate, not a particular dataset size. Record any scope deviation against the 2,000-paper target; a proposed CC BY license is not blanket permission to relicense source text.
Apply the root scientific evidence contract: provenance; meaningful independent splits; no future-data leakage; baseline comparison; actual denominators/uncertainty; failed cases; human review where required. State whether data are simulated, public experimental, synthetic or partner-provided.
Keep source gates intact, and log scope/time conflicts in review. Missing people, money, access or results must not be replaced with invented evidence. Reduce optional polish first. A specific essential external dependency stays pending while independent preparation continues.
07
READ FIRST
Completion and gate review
This is Gate 13: Dataset release.
Required proof: FermLit v0.5 public with dataset card and DOI; Paper 1 skeleton with all figures; at least one dated live endorsement conversation.
Reputation interpretation: L2. Record target, forecast, actual date and evidence link. The original gate stays incomplete until the required external proof exists.
Monday artifact satisfies: Card, version, actual N, quality metrics and allowed distribution are verified before release.
Wednesday artifact satisfies: All six figures have source data/commands; missing results remain visibly unresolved.
Friday artifact satisfies: No unsupported claim is promoted into a headline; endorsement conversation status is dated.
Study pack is prepared; Peter's actual learning/quiz result is recorded separately.
Branding and opportunity drafts use supported claims and the correct external-action state.
Reproduction or document checks are recorded with file/version references.
This week's special gate, if any, has real evidence or remains explicitly pending.
Review, root progress/log and the next physical action are updated.
08
READ FIRST
Minimum viable week and recovery
Source-preserving minimum: the HF dataset.
Operational first step if stalled: open dataset-release-checklist.md, write the required inputs and produce the smallest checkable example in ten minutes. If a more urgent missing gate dependency controls the week, use the source minimum above.
If the full week does not fit, use P14: retain one gate-critical deliverable and one directly supporting study exercise; record what is skipped versus moved. Do not mark the original full gate passed merely because the minimum was completed. After a missed week, reforecast from actual evidence and avoid a second unexamined lost week.
09
OPEN WHEN NEEDED
Handoff to the next model
In review, state exactly what exists, what was verified, what Peter can now explain, which external events remain pending, where the canonical code/data live, and the next file/function or draft paragraph to touch. Link each fact to evidence. Carry scientific assumptions, split definitions and rights constraints forward explicitly.
10
OPEN WHEN NEEDED
Ready-to-copy model prompt
Prepare Week 13 of this LABLOOP execution plan.
Read execution-plan/specs.md, execution-plan/DECISIONS.md,
execution-plan/GATES.md and
execution-plan/weeks/week-13-fermlit-release-and-paper-outline/specs.md, commitment.md, evidence.md and review.md.
Read prior prerequisite reviews and inspect actual repository/data state.
Use v5 as the governing sequence, the v6 Week 13 chapter
(LABLOOP-Master-Plan-v6.md) as the deeper walkthrough, and v4 only for
retained details.
Produce the full local preparation pack and the exact week-specific files named
in the artifact table. Give me a bounded lesson with exercises/answer key,
daily physical actions, technical runbook or draft, branding drafts and
career/commercial actions. Keep the total to 600 minutes.
Separate prepared artifacts from measured results and my learning completion.
Verify sources and do not invent metrics, citations, papers, people or outcomes.
Do not execute external communications, publication or spending unless the
current session already authorizes the specific action.
Finish by updating evidence/review and TODAY with the next physical action.
11
OPEN WHEN NEEDED
Preserved original v5 weekly brief
v6 reproduces this brief unchanged inside v6 · Week 13 · GATE 13: FermLit v0.5 public, Paper 1 outlined.
The following is source planning text, not a claim of completion. Apply the explicit evidence corrections in this specification and DECISIONS.md.
Goal: dataset on Hugging Face and Zenodo; Paper 1 skeleton with all figures.
Tue (B13): MSMB ch. 1-2.
Thu (M13): von Stosch review + Neural ODE abstract.
Build: Mon: HF dataset upload with card, Zenodo DOI, fermlit v0.5 release. Wed: Paper 1 skeleton with Prompt P9: title, abstract with numbers, 6 figures placed, methods bullet-pointed. Fri: Prompt P10 (reviewer 2) on the skeleton; list of every claim without evidence; plan the fixes.
Sun:M3 deep dive: "FermLit: 2,000 fermentation papers, one table, and what is missing from them". Z3, HF. L-Sun. Gauge: L2 solid, L3 in sight.
Gate 13 passes when: dataset public with DOI and card; Paper 1 skeleton has every figure; at least one endorsement conversation alive.
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: fermlit release and paper outline.
Minimum that keeps the next gate alive: the HF dataset.
Deliverables to commit
☐ dataset-release-checklist.md: Card, version, actual N, quality metrics and allowed distribution are verified before release.
☐ paper-1-outline.md: All six figures have source data/commands; missing results remain visibly unresolved.
☐ paper-1-claims-audit.md: No unsupported claim is promoted into a headline; endorsement conversation status is dated.
☐ Bounded learning exercise and personal teach-back.
Assemble Paper 1 skeleton with six figures, contribution claims, methods and availability statements. Last ten minutes: optional note.
Not set
☐
Thu
90
Hybrid model v0: Monod + GBM residual Include relevant founder-paper work within this block.
Not set
☐
Fri
90
Review the skeleton as a skeptical scientist and link each unsupported claim to a correction owner and deadline.
Not set
☐
Sat
90
Resolve critical spillover; long-form draft if due; sandbox only if done.
Not set
☐
Sun
60
Build log, evidence, gap review, next actions.
Not set
☐
Dependency and capacity check
Missing essential inputs: not yet inspected.
Human/external dependency, owner and expected date: not yet inspected.
Week-specific constraint: Public dataset plus DOI and outline are the gate, not a particular dataset size. Record any scope deviation against the 2,000-paper target; a proposed CC BY license is not blanket permission to relicense source text.
Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
Scope to cut first: optional polish/additional examples; preserve scientific validity.
If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending.
Reviewing model and date: pending.
Execution state: NOT_STARTED. Specification
This file is a blank register with planned artifact names; none of the rows prove completion.
Item
Path / URL / version
State
Verification / actual result
Verified by / date
dataset-release-checklist.md
Not created
NOT_STARTED
Pending: Card, version, actual N, quality metrics and allowed distribution are verified before release.
—
paper-1-outline.md
Not created
NOT_STARTED
Pending: All six figures have source data/commands; missing results remain visibly unresolved.
—
paper-1-claims-audit.md
Not created
NOT_STARTED
Pending: No unsupported claim is promoted into a headline; endorsement conversation status is dated.
—
Learning exercise / Peter's quiz
Not created
NOT_STARTED
Peter's actual answers required
—
Founder paper digest
Not created
NOT_STARTED
Source/content and access checked
—
Branding pack
Not created
NOT_STARTED
Claims audited; drafted/public status distinct
—
Opportunity actions
Not created
NOT_STARTED
Drafted/sent/replied/booked/held distinct
—
Gate 13
No evidence
NOT_STARTED
FermLit v0.5 public with dataset card and DOI; Paper 1 skeleton with all figures; at least one dated live endorsement conversation.
—
Reproduction and scientific measurements
Question / metric
Dataset, N and unit
Split / seed / config
Command or verification method
Output path and measured value
Uncertainty / limitation
External events, when authorized and actually performed
Date
Action / counterpart
Receipt or private reference
State
Next action / date
Actual learning and decisions
Peter's teach-back / quiz score: not assessed.
Scientific assumptions and deviations: none recorded yet.
Budget allocated / spent: not assessed / no spend recorded.
Missing evidence and responsible owner: pending inspection.
Do not put API keys, source full texts with restricted rights, client data or invoice personal details in a public version of this register. Keep private evidence references private.
☐ Card, version, actual N, quality metrics and allowed distribution are verified before release. Evidence: pending.
☐ All six figures have source data/commands; missing results remain visibly unresolved. Evidence: pending.
☐ No unsupported claim is promoted into a headline; endorsement conversation status is dated. Evidence: pending.
☐ Learning assessed from Peter's actual answers. Evidence: pending.
☐ Branding/opportunity states recorded correctly. Evidence: pending.
Learning and outcome
What Peter can explain or reproduce now: not assessed.
Quiz / teach-back gaps: not assessed.
Measured result and limitations: pending.
Best evidence link for a scientist/recruiter/buyer: pending.
What failed or changed, and why: pending.
Gate and capacity
Gate requirement: FermLit v0.5 public with dataset card and DOI; Paper 1 skeleton with all figures; at least one dated live endorsement conversation.
Gate status: NOT_STARTED.
Original target week: 13.
Actual completion date / forecast: not set.
Missing external evidence: pending inspection.
Blocks completed / 7: not recorded.
Days with commits / 7: not recorded.
Sunday build log / optional Wednesday note: not recorded.
Founder conversations cumulative: not recorded.
Earned evidence level and proof: not assessed.
Consecutive lost weeks: not assessed.
Week-specific risk to revisit: Public dataset plus DOI and outline are the gate, not a particular dataset size. Record any scope deviation against the 2,000-paper target; a proposed CC BY license is not blanket permission to relicense source text.
Decision and next-model handoff
Continue / recover / blocked: not decided.
Retain as the minimum: the HF dataset.
Skipped permanently with reason: none recorded.
Carryover with owner, dependency and target week: none recorded.
Canonical repository paths and versions: pending.
Data permissions, split definitions or assumptions to preserve: pending.
External action authorization that still applies: not assessed.
Next physical action, exact file/function/paragraph: pending.
Updates to root PROGRESS / LOG / TODAY completed: ☐