Week 13 commitment

3 parts426 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: fermlit release and paper outline. Minimum that keeps the next gate alive: the HF dataset.

01

01

Deliverables to commit

  • dataset-release-checklist.md: Card, version, actual N, quality metrics and allowed distribution are verified before release.
  • paper-1-outline.md: All six figures have source data/commands; missing results remain visibly unresolved.
  • paper-1-claims-audit.md: No unsupported claim is promoted into a headline; endorsement conversation status is dated.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Prepare FermLit v0.5 dataset card, permitted export, data/code citation metadata and HF/Zenodo release package. Not set [ ]
Tue 90 Two exercises redone in Python Not set [ ]
Wed 90 Assemble Paper 1 skeleton with six figures, contribution claims, methods and availability statements. Last ten minutes: optional note. Not set [ ]
Thu 90 Hybrid model v0: Monod + GBM residual Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Review the skeleton as a skeptical scientist and link each unsupported claim to a correction owner and deadline. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Public dataset plus DOI and outline are the gate, not a particular dataset size. Record any scope deviation against the 2,000-paper target; a proposed CC BY license is not blanket permission to relicense source text.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.