# Week 13 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: fermlit release and paper outline.
Minimum that keeps the next gate alive: the HF dataset.

## Deliverables to commit

- [ ] `dataset-release-checklist.md`: Card, version, actual N, quality metrics and allowed distribution are verified before release.
- [ ] `paper-1-outline.md`: All six figures have source data/commands; missing results remain visibly unresolved.
- [ ] `paper-1-claims-audit.md`: No unsupported claim is promoted into a headline; endorsement conversation status is dated.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Prepare FermLit v0.5 dataset card, permitted export, data/code citation metadata and HF/Zenodo release package. | Not set | [ ] |
| Tue | 90 | Two exercises redone in Python | Not set | [ ] |
| Wed | 90 | Assemble Paper 1 skeleton with six figures, contribution claims, methods and availability statements. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Hybrid model v0: Monod + GBM residual Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Review the skeleton as a skeptical scientist and link each unsupported claim to a correction owner and deadline. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Public dataset plus DOI and outline are the gate, not a particular dataset size. Record any scope deviation against the 2,000-paper target; a proposed CC BY license is not blanket permission to relicense source text.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.