execution-plan/weeks/week-29-audit-delivery-or-sales-recovery/commitment.md Β· UPDATED 2026-09-16
Week 29 commitment
3 parts472 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: audit delivery or sales recovery. Minimum that keeps the next gate alive: Record the delivery-versus-recovery branch and produce either one evidence-backed client readout or one qualified proposal with a dated next action.
0101
Deliverables to commit
01
Deliverables to commit
-
week-29-branch.md: Record the delivery-versus-recovery branch and produce either one evidence-backed client readout or one qualified proposal with a dated next action. -
loop-map-and-inventory.md: Measured versus estimated cycle times are explicit, or recovery contact actions are evidenced. -
audit-readout-1.md: The prototype has an acceptance measure, or proposal status is recorded honestly. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Choose the branch from actual week 28 evidence: contracted audit delivery or selling recovery; document revised downstream dates. | Not set | [ ] |
| Tue | 90 | One concise applied note, a worked decision/example and unresolved questions. | Not set | [ ] |
| Wed | 90 | For a sold audit, map the experimental loop and inventory data sources/owners/quality; for recovery, refine objections and follow up with qualified leads. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | For a sold audit, run one bounded prototype on authorized sample data and prepare a client readout; for recovery, finalize a reviewable scope and proposal. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: The source audit promises about 20 hours over two weeks. With research/study overhead this may not fit; document the allocation and negotiate duration or scope before promising delivery.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.