# Week 29 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: audit delivery or sales recovery.
Minimum that keeps the next gate alive: Record the delivery-versus-recovery branch and produce either one evidence-backed client readout or one qualified proposal with a dated next action.

## Deliverables to commit

- [ ] `week-29-branch.md`: Record the delivery-versus-recovery branch and produce either one evidence-backed client readout or one qualified proposal with a dated next action.
- [ ] `loop-map-and-inventory.md`: Measured versus estimated cycle times are explicit, or recovery contact actions are evidenced.
- [ ] `audit-readout-1.md`: The prototype has an acceptance measure, or proposal status is recorded honestly.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Choose the branch from actual week 28 evidence: contracted audit delivery or selling recovery; document revised downstream dates. | Not set | [ ] |
| Tue | 90 | One concise applied note, a worked decision/example and unresolved questions. | Not set | [ ] |
| Wed | 90 | For a sold audit, map the experimental loop and inventory data sources/owners/quality; for recovery, refine objections and follow up with qualified leads. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | For a sold audit, run one bounded prototype on authorized sample data and prepare a client readout; for recovery, finalize a reviewable scope and proposal. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: The source audit promises about 20 hours over two weeks. With research/study overhead this may not fit; document the allocation and negotiate duration or scope before promising delivery.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.