execution-plan/weeks/week-21-protein-study-and-partner-scope/specs.md

execution-plan/weeks/week-21-protein-study-and-partner-scope/specs.md Β· UPDATED 2026-10-01

Week 21 β€” protein study and partner scope

13 parts2,645 words 8 checkboxes β€” tick them, they save to the file

Full learning notebook: explanations, step-by-step challenges, stashes and evidence Β· NotebookLM export

Status: NOT_STARTED. Calendar dates: not assigned. Owner: Peter Ciancaglini. Planning authority: v5 Part 7 with retained v4 details. Deeper walkthrough: v6 Β· Week 21 Β· Paper 3 scoped with a partner. Active project/repository: enzymelens.

Programme Β· Model instructions Β· Decisions Β· Resources Β· v6 walkthrough Β· Previous week review Β· Next week

01

01

Outcome and relevance

This week delivers the three concrete artifacts below and the supporting learning/branding/opportunity pack. The scientific or commercial outcome follows the preserved source brief, while the acceptance checks make its evidence testable. The career objective is to turn this work into something a scientist, hiring manager or buyer can inspect.

  • Scientific/build priority: Write Paper 3 question, target quantity, label context, dataset/split choice and available partner capabilities; create the repository plan.
  • Public/profile priority: Draft a protein-ML transition post linking the new question to earlier evaluation work.
  • Career/relationship/commercial priority: Prepare a call with one of three researched partner candidates and R&D discovery requests to established companies; continue live applications.
↑ Back to top
02

02

Deeper walkthrough (v6)

Read v6 Β· Week 21 Β· Paper 3 scoped with a partner before Monday. It expands this week's one-row v5 brief into daily build steps and adds the Welcome analogy, Learn it (β–Ά core and οΌ‹ deeper sources), Run it (repos with a 20-40 minute exercise), the NotebookLM kit and the mentor check below. Standing v6 rules: resource rules, NotebookLM protocol, chapter anatomy. v6 adds depth only; it does not change a goal, gate, output or the 600-minute cap, so this specification still governs execution.

Act V Β· Threads: B, EL, R Β· Next gate: 24

Where this week sits. - ← From: week 16-17 (ESM-2, Meltome baseline), week 18 (extremophile founder digests), Part 9.3 ladder (rungs 1-4 with those founders). - β†’ Feeds: week 22 (honest baselines), week 23 (partner-specific candidates), week 24 (co-author agreement), weeks 30-32 (Paper 3). - ⟳ Returns in: Paper 3 Introduction and Methods.

Goals. - 🎯 This week: enzymelens repo; embeddings cached; baseline table for three heads; partner call booked. - 🏁 Next milestone: Gate 24 (written co-author agreement; pre-registered validation plan). - 🌟 Final: Paper 3 with a founder co-author and wet-lab validation (wk 32).

The plan (from v5 Part 7, expanded; gate and output unchanged).

v5 row: 21 | Paper 3 scoped with a partner | Meltome and FLIP deep read; extremophile enzyme families of the 3 candidate partners (Puna Bio, Antarka, APEXzymes) | enzymelens repo; ESM-2 embeddings for the full Meltome split cached on disk (overnight on the 3050); ridge/GBM/MLP heads; baseline table | Partner call booked with the FermLit + batchlens preprints as the calling card - Goal: Paper 3 has a candidate partner, a dataset on disk and a baseline table. - Tue (study): FLIP thermostability task and Meltome atlas, deep read; for each of the 3 candidate partners, list the enzyme families (EC classes) and organisms they publish on. - Build: [ ] Mon: enzymelens skeleton (same README template as Part 5.2); download Meltome splits; start overnight embedding job with checkpointing. Done when the job resumes after an interruption. [ ] Wed: ridge, LightGBM and a 2-layer MLP on cached embeddings; Spearman ρ with bootstrap intervals. Done when the baseline table regenerates with make baselines. [ ] Fri: partner email (P13, co-authorship variant) sent to the most engaged founder, with both preprints and one figure relevant to their enzyme class. Done when the call is booked or a follow-up date is logged. - Sun: L-Sun "What a protein language model sees in 30,000 melting curves" with the baseline table. - Only one thing: the partner call booked.

Mentor check. "I can explain what my baseline predicts, how well, and why the partner's lab is the only way to know if it matters."

↑ Back to top
03

03

Required inputs and dependency check

↑ Back to top
04

04

Seven-day plan: 600 minutes maximum

The model must turn these into exact physical actions using the observed files and available inputs. Each 90-minute block includes start/stop rituals. All calls, posts, debugging, reading and exercises consume this same capacity.

Day Budget Work and stopping condition
Monday 90 min Write Paper 3 question, target quantity, label context, dataset/split choice and available partner capabilities; create the repository plan. Stop when: Write paper-3-protocol.md with one testable target, one dataset/split and a concrete partner-call request; run one verified baseline if data are ready.
Tuesday 90 min Meltome/FLIP task definitions and partner enzyme papers; read label-generation methods and split design. Produce a target/context comparison and five biological questions. Produce: One concise applied note, a worked decision/example and unresolved questions.
Wednesday 90 min Benchmark a small embedding batch, then cache permitted sequences with model/version, pooling, truncation and checksums. Stop when: Actual memory/runtime fit is measured before a full run; failed sequences are retained. Reserve the last 10 minutes for the optional Wednesday note.
Thursday 90 min Revisit the ESM model card and implement a bounded embedding smoke test; compare sequence length, pooling and actual VRAM. Last 30 minutes: verified partner paper digest. Apply the Half 2 one-formal-study-block rule.
Friday 90 min Train ridge/GBM/small-MLP baselines on frozen splits and prepare partner call materials. Stop when: A baseline table and concrete request for scientific input exist.
Saturday 90 min Resolve the earliest critical spillover or dependency. Prepare any long-form publication draft from existing figures here if needed. Sandbox only after commitments are met.
Sunday 60 min 20 min build-log draft/publication when authorized; 5 min evidence/checklist; 20 min source-grounded gap review; 15 min next week's six physical actions.

Half 2: Tuesday is the formal study block unless this is a selling/submission/decision week. Thursday supports applied review, partner work or the market task; do not add another full course.

↑ Back to top
05

05

Learning specification

Biology/domain unit

Material: Meltome/FLIP task definitions and partner enzyme papers; read label-generation methods and split design. Produce a target/context comparison and five biological questions.

Produce: One concise applied note, a worked decision/example and unresolved questions.

Understanding check: The note directly supports this week's experiment, collaboration, delivery or career action.

During preparation, write one worked example connected to the week's actual task, one exercise with a separate answer key and five questions. Peter supplies answers; score explanation quality and flag misconceptions in QUESTIONS. Numeric/scientific conclusions require actual data or explicitly synthetic teaching values.

AI/scientific-method unit

Material: Revisit the ESM model card and implement a bounded embedding smoke test; compare sequence length, pooling and actual VRAM. Last 30 minutes: verified partner paper digest.

Produce: One concise applied note, a worked decision/example and unresolved questions.

Understanding check: The note directly supports this week's experiment, collaboration, delivery or career action.

Use the prompt pack: P1 explanation ladder, P2 concept-to-project bridge and P3 quiz. Coding practice belongs within the allocated study/build block. Where the source asks for a favorable scientific result, substitute an honest measured comparison as explained below.

Founder/scientist paper

Select one verified founder/scientific-lead paper relevant to this week's domain. Use P11; save the question, method, numerical result with context, data workflow, three author questions and one connection sentence in founder-paper.md. Keep abstract-only access limitations explicit. On source weeks with no study, prioritize the commercial/submission task and log any skipped digest.

↑ Back to top
06

06

Artifact contracts

These filenames are outputs to prepare during this week's execution; this scaffold does not claim they already exist. Drafts and measured results have different states. Technical code/data stay in the canonical project repository and are referenced from these coordinating files.

Artifact Required content / acceptance Primary responsibility
paper-3-protocol.md Write Paper 3 question, target quantity, label context, dataset/split choice and available partner capabilities; create the repository plan. Acceptance: Write paper-3-protocol.md with one testable target, one dataset/split and a concrete partner-call request; run one verified baseline if data are ready. Model assists; Peter checks and owns the outcome
embedding-manifest.csv Benchmark a small embedding batch, then cache permitted sequences with model/version, pooling, truncation and checksums. Acceptance: Actual memory/runtime fit is measured before a full run; failed sequences are retained. Model assists; Peter checks and owns the outcome
protein-baselines.csv Train ridge/GBM/small-MLP baselines on frozen splits and prepare partner call materials. Acceptance: A baseline table and concrete request for scientific input exist. Model assists; Peter checks and owns the outcome
study-notes.md Selected exact free resources; bounded lesson/exercise; separate solution; quiz and grading rubric; Peter's answers and gaps when executed Model prepares; Peter learns
founder-paper.md Verified source and P11 digest; authentic question and connection sentence; access limitations Model assists; Peter checks
branding-pack.md Wednesday note, Sunday build log, X adaptation, figure/caption/alt text and the week's special asset; each claim linked to real proof Model drafts; Peter owns voice/public claims
opportunity-actions.md Qualified target/role, source/date, ladder stage, next action, message/interview/proposal draft and actual status Model prepares; Peter owns external relationships
evidence.md Actual paths/URLs, versions, checks/metrics, preparation versus execution state and external receipts when applicable Updated after each deliverable
review.md Checklist, learning assessment, gate status, shortfalls, next actions and carryover Peter and reviewing model

During preparation, future measured tables get column definitions, input requirements and run instructions with PENDING status. During execution, replace pending values only with measured outputs. Do not create realistic-looking fake evidence.

↑ Back to top
07

07

Branding and opportunity execution brief

Branding: Draft a protein-ML transition post linking the new question to earlier evaluation work.

Opportunity action: Prepare a call with one of three researched partner candidates and R&D discovery requests to established companies; continue live applications.

Use career asset contracts. Publish at most the agreed cadence; one figure and one supported number or admitted failure can support multiple drafts. In long-form weeks, prepare a 1,500–2,500-word article from existing evidence within the build/buffer allocation. In release/demo weeks, prepare a 60-second script: problem, input, command/action, result, limitation and proof link.

Verify individuals, jobs and affiliations at execution time. The GridX list and v4 company map are research seeds, not current facts. Do not reveal named company weaknesses or employer/client confidential information. Keep drafted/sent/replied/booked/held statuses separate. The planning request alone does not authorize external messages or publication; honor explicit authorization in the execution session.

↑ Back to top
08

08

Quality risks and week-specific constraints

An overnight embedding job is unattended compute, not extra working hours. Thermal proteome measurements are not automatically purified-enzyme stability measurements.

Apply the root scientific evidence contract: provenance; meaningful independent splits; no future-data leakage; baseline comparison; actual denominators/uncertainty; failed cases; human review where required. State whether data are simulated, public experimental, synthetic or partner-provided.

Keep source gates intact, and log scope/time conflicts in review. Missing people, money, access or results must not be replaced with invented evidence. Reduce optional polish first. A specific essential external dependency stays pending while independent preparation continues.

↑ Back to top
09

09

Completion and gate review

This is an enabling week. Its deliverables feed the next scheduled gate: 24. Complete the acceptance checklist below; do not promote reputation from a draft.

  • Monday artifact satisfies: Write paper-3-protocol.md with one testable target, one dataset/split and a concrete partner-call request; run one verified baseline if data are ready.
  • Wednesday artifact satisfies: Actual memory/runtime fit is measured before a full run; failed sequences are retained.
  • Friday artifact satisfies: A baseline table and concrete request for scientific input exist.
  • Study pack is prepared; Peter's actual learning/quiz result is recorded separately.
  • Branding and opportunity drafts use supported claims and the correct external-action state.
  • Reproduction or document checks are recorded with file/version references.
  • This week's special gate, if any, has real evidence or remains explicitly pending.
  • Review, root progress/log and the next physical action are updated.
↑ Back to top
10

10

Minimum viable week and recovery

Expanded minimum derived from the source goal: Write paper-3-protocol.md with one testable target, one dataset/split and a concrete partner-call request; run one verified baseline if data are ready.

Operational first step if stalled: open paper-3-protocol.md, write the required inputs and produce the smallest checkable example in ten minutes. If a more urgent missing gate dependency controls the week, use the source minimum above.

If the full week does not fit, use P14: retain one gate-critical deliverable and one directly supporting study exercise; record what is skipped versus moved. Do not mark the original full gate passed merely because the minimum was completed. After a missed week, reforecast from actual evidence and avoid a second unexamined lost week.

↑ Back to top
11

11

Handoff to the next model

In review, state exactly what exists, what was verified, what Peter can now explain, which external events remain pending, where the canonical code/data live, and the next file/function or draft paragraph to touch. Link each fact to evidence. Carry scientific assumptions, split definitions and rights constraints forward explicitly.

↑ Back to top
12

12

Ready-to-copy model prompt

Prepare Week 21 of this LABLOOP execution plan.
Read execution-plan/specs.md, execution-plan/DECISIONS.md,
execution-plan/GATES.md and
execution-plan/weeks/week-21-protein-study-and-partner-scope/specs.md, commitment.md, evidence.md and review.md.
Read prior prerequisite reviews and inspect actual repository/data state.
Use v5 as the governing sequence, the v6 Week 21 chapter
(LABLOOP-Master-Plan-v6.md) as the deeper walkthrough, and v4 only for
retained details.
Produce the full local preparation pack and the exact week-specific files named
in the artifact table. Give me a bounded lesson with exercises/answer key,
daily physical actions, technical runbook or draft, branding drafts and
career/commercial actions. Keep the total to 600 minutes.
Separate prepared artifacts from measured results and my learning completion.
Verify sources and do not invent metrics, citations, papers, people or outcomes.
Do not execute external communications, publication or spending unless the
current session already authorizes the specific action.
Finish by updating evidence/review and TODAY with the next physical action.
↑ Back to top
13

13

Preserved original v5 weekly brief

v6 expands this row into a full brief, with the gate and output unchanged, inside v6 Β· Week 21 Β· Paper 3 scoped with a partner. The following is source planning text, not a claim of completion. Apply the explicit evidence corrections in this specification and DECISIONS.md.

Week Goal Study (Tue) Build (Mon/Wed/Fri) Output
21 Paper 3 scoped with a partner Meltome and FLIP deep read; extremophile enzyme families of the 3 candidate partners (Puna Bio, Antarka, APEXzymes) enzymelens repo; ESM-2 embeddings for the full Meltome split cached on disk (overnight on the 3050); ridge/GBM/MLP heads; baseline table Partner call booked with the FermLit + batchlens preprints as the calling card
↑ Back to top
⏱ Focus Focus25:00 0 min today