Week 21 commitment

3 parts443 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: protein study and partner scope. Minimum that keeps the next gate alive: Write paper-3-protocol.md with one testable target, one dataset/split and a concrete partner-call request; run one verified baseline if data are ready.

01

01

Deliverables to commit

  • paper-3-protocol.md: Write paper-3-protocol.md with one testable target, one dataset/split and a concrete partner-call request; run one verified baseline if data are ready.
  • embedding-manifest.csv: Actual memory/runtime fit is measured before a full run; failed sequences are retained.
  • protein-baselines.csv: A baseline table and concrete request for scientific input exist.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Write Paper 3 question, target quantity, label context, dataset/split choice and available partner capabilities; create the repository plan. Not set [ ]
Tue 90 One concise applied note, a worked decision/example and unresolved questions. Not set [ ]
Wed 90 Benchmark a small embedding batch, then cache permitted sequences with model/version, pooling, truncation and checksums. Last ten minutes: optional note. Not set [ ]
Thu 90 One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Train ridge/GBM/small-MLP baselines on frozen splits and prepare partner call materials. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: An overnight embedding job is unattended compute, not extra working hours. Thermal proteome measurements are not automatically purified-enzyme stability measurements.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.