Week 15 commitment

3 parts411 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: paper 1 review and revision. Minimum that keeps the next gate alive: human review requested.

01

01

Deliverables to commit

  • paper-1-review-response.md: Every substantive issue is fixed, justified or explicitly unresolved.
  • human-review-brief.md: Request and actual review receipt have separate dated statuses.
  • paper-1-submission-checklist.md: A clean build produces the correct PDF and all mandatory fields are ready.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Run two critical model reviews and create an issue-by-issue response with source checks and rerun requests. Not set [ ]
Tue 90 Structured digests in notes/papers/ Not set [ ]
Wed 90 Prepare/send the manuscript and review rubric to one human scientist under existing authorization, with an agreed return date. Last ten minutes: optional note. Not set [ ]
Thu 90 Per-field precision/recall, kappa between annotators Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Finalize figures and build the manuscript from versioned source; audit citations, author contributions and all quantitative claims. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Human review requested is a recovery minimum, not proof that review occurred. If feedback has not arrived, week 16 publication readiness remains pending.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.