# Week 15 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: paper 1 review and revision.
Minimum that keeps the next gate alive: human review requested.

## Deliverables to commit

- [ ] `paper-1-review-response.md`: Every substantive issue is fixed, justified or explicitly unresolved.
- [ ] `human-review-brief.md`: Request and actual review receipt have separate dated statuses.
- [ ] `paper-1-submission-checklist.md`: A clean build produces the correct PDF and all mandatory fields are ready.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Run two critical model reviews and create an issue-by-issue response with source checks and rerun requests. | Not set | [ ] |
| Tue | 90 | Structured digests in `notes/papers/` | Not set | [ ] |
| Wed | 90 | Prepare/send the manuscript and review rubric to one human scientist under existing authorization, with an agreed return date. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Per-field precision/recall, kappa between annotators Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Finalize figures and build the manuscript from versioned source; audit citations, author contributions and all quantitative claims. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Human review requested is a recovery minimum, not proof that review occurred. If feedback has not arrived, week 16 publication readiness remains pending.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.
