execution-plan/weeks/week-11-fermlit-dataset-engineering/commitment.md Β· UPDATED 2026-09-16
Week 11 commitment
3 parts413 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: fermlit dataset engineering. Minimum that keeps the next gate alive: normalized dataset export.
0101
Deliverables to commit
01
Deliverables to commit
-
normalization-audit.md: Conversions have dimensions and assumptions; incompatible percent values are not silently converted to g/L. -
analysis-plan.md: Exploratory versus planned analyses are distinguished before significance claims. -
dataset-card-draft.md: A small reload check reproduces row counts and schema; redistribution terms are justified. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Normalize supported concentration/yield units, taxonomy identifiers and duplicates while preserving original strings and provenance. | Not set | [ ] |
| Tue | 90 | kLa estimated from IndPenSim DO data | Not set | [ ] |
| Wed | 90 | Formalize completeness questions and comparison groups; predefine effect sizes and the multiple-testing family for week 14. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | BO on the simulator's feed profile Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Export versioned data and draft the dataset card, known limitations and per-source rights assessment. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: DO time series alone generally do not identify kLa without other information. The study exercise must document identifiability and assumptions or report that estimation is unsupported.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.