# Week 11 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: fermlit dataset engineering.
Minimum that keeps the next gate alive: normalized dataset export.

## Deliverables to commit

- [ ] `normalization-audit.md`: Conversions have dimensions and assumptions; incompatible percent values are not silently converted to g/L.
- [ ] `analysis-plan.md`: Exploratory versus planned analyses are distinguished before significance claims.
- [ ] `dataset-card-draft.md`: A small reload check reproduces row counts and schema; redistribution terms are justified.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Normalize supported concentration/yield units, taxonomy identifiers and duplicates while preserving original strings and provenance. | Not set | [ ] |
| Tue | 90 | kLa estimated from IndPenSim DO data | Not set | [ ] |
| Wed | 90 | Formalize completeness questions and comparison groups; predefine effect sizes and the multiple-testing family for week 14. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | BO on the simulator's feed profile Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Export versioned data and draft the dataset card, known limitations and per-source rights assessment. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: DO time series alone generally do not identify kLa without other information. The study exercise must document identifiability and assumptions or report that estimation is unsupported.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.
