execution-plan/weeks/week-09-fermlit-scale-up/commitment.md Β· UPDATED 2026-09-16
Week 09 commitment
3 parts422 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: fermlit scale up. Minimum that keeps the next gate alive: the completeness table.
0101
Deliverables to commit
01
Deliverables to commit
-
corpus-scale-manifest.csv: Every included paper has a stable identity and eligible full text. -
extraction-cost-report.csv: Success/failure counts, token or local-runtime use and measured cost are recorded. -
completeness-table.csv: Not reported, not extracted and unavailable full text remain separate categories. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Expand the screened corpus toward 2,000 papers; deduplicate preprint/journal versions and record exclusions and license restrictions. | Not set | [ ] |
| Tue | 90 | Mass balances for batch, fed-batch, continuous in a notebook | Not set | [ ] |
| Wed | 90 | Run the selected backend with resumable jobs, retry limits, caching, quality checks and a small paid pilot before bulk execution. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Bigram model on organism names from FermLit Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Produce the field completeness table by organism/year with a manually checked missingness sample. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Two thousand is a target, not an inclusion rule. Automated failure is not evidence that authors omitted a field; disclose selection bias and stop runs at the agreed budget.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.