execution-plan/weeks/week-09-fermlit-scale-up/specs.md Β· UPDATED 2026-10-01
Week 09 β fermlit scale up
Full learning notebook: explanations, step-by-step challenges, stashes and evidence Β· NotebookLM export
Status: NOT_STARTED. Calendar dates: not assigned. Owner: Peter Ciancaglini. Planning authority: v5 Part 6 with retained v4 details. Deeper walkthrough: v6 Β· Week 9 Β· FermLit at scale. Active project/repository: fermlit.
Programme Β· Model instructions Β· Decisions Β· Resources Β· v6 walkthrough Β· Previous week review Β· Next week
0101
Outcome and relevance
01
Outcome and relevance
This week delivers the three concrete artifacts below and the supporting learning/branding/opportunity pack. The scientific or commercial outcome follows the preserved source brief, while the acceptance checks make its evidence testable. The career objective is to turn this work into something a scientist, hiring manager or buyer can inspect.
- Scientific/build priority: Expand the screened corpus toward 2,000 papers; deduplicate preprint/journal versions and record exclusions and license restrictions.
- Public/profile priority: Draft corpus-scale results with actual N and uncertainty around automated completeness estimates.
- Career/relationship/commercial priority: Share a relevant organism-level preliminary figure with an existing contact after verifying source rights and results.
0202
Deeper walkthrough (v6)
02
Deeper walkthrough (v6)
Read v6 Β· Week 9 Β· FermLit at scale before Monday. It carries this week's v5 brief unchanged and adds the Welcome analogy, Learn it (βΆ core and οΌ deeper sources), Run it (repos with a 20-40 minute exercise), the NotebookLM kit and the mentor check below. Standing v6 rules: resource rules, NotebookLM protocol, chapter anatomy. v6 adds depth only; it does not change a goal, gate, output or the 600-minute cap, so this specification still governs execution.
Act III Β· Threads: B, M, FL Β· Next gate: 13
Where this week sits. - β From: weeks 5-7 (corpus, schema, measured agent), week 1 (your mass balances). - β Feeds: week 10 (descriptive analysis on 2,000 records), week 11 (reporting-completeness as a formal result), week 13 (dataset release), weeks 14-16 (Paper 1 Results). - β³ Returns in: Paper 1 figure 1 (completeness by field), and in every LinkedIn post that says "X% of papers do not report pH".
Goals. - π― This week: 2,000 papers extracted within the F1 floor, a cost table, and a completeness table per field. - π Next milestone: Gate 13 (FermLit v0.5 public, Paper 1 skeleton). - π Final: the reporting-completeness finding that makes Paper 1 more than a dataset.
Mentor check. "I can say what fraction of 2,000 fermentation papers report each key parameter, and why that number is trustworthy."
0303
Required inputs and dependency check
03
Required inputs and dependency check
- Week 07: inspect its actual evidence and review; source/code artifacts must exist before the dependent task begins.
- Week 08: inspect its actual evidence and review; source/code artifacts must exist before the dependent task begins.
- Read commitment, evidence, review and the current root TODAY/PROGRESS/QUESTIONS files.
- Read this week's chapter, v6 Β· Week 9 Β· FermLit at scale, then the standing sections: Part 0 Β· how to use the document, Part 3 Β· the scientific thesis, Part 4 Β· curriculum, Part 8 Β· the prompt pack and Part 9 Β· branding and endorsement. The same sections exist in the v5 master, which remains the governing sequence; v6 reproduces them and adds depth. Retained commercial/instrument details come from v4.
- Inspect the actual canonical repository state, available data, existing figures and required human/external inputs. Never assume a previous week succeeded from its folder name.
- Verify current resource links, versions, dataset rights and any live company/venue information before relying on them. Use source catalog; explicitly record inaccessible resources.
0404
Seven-day plan: 600 minutes maximum
04
Seven-day plan: 600 minutes maximum
The model must turn these into exact physical actions using the observed files and available inputs. Each 90-minute block includes start/stop rituals. All calls, posts, debugging, reading and exercises consume this same capacity.
| Day | Budget | Work and stopping condition |
|---|---|---|
| Monday | 90 min | Expand the screened corpus toward 2,000 papers; deduplicate preprint/journal versions and record exclusions and license restrictions. Stop when: Every included paper has a stable identity and eligible full text. |
| Tuesday | 90 min | NPTEL "Bioreactors" (IIT Madras, Prof. G. K. Suraishkumar), lectures 1-3 β nptel.ac.in (verify current playlist); MIT OCW 10.37 lecture notes on bioreactors as backup Produce: Mass balances for batch, fed-batch, continuous in a notebook |
| Wednesday | 90 min | Run the selected backend with resumable jobs, retry limits, caching, quality checks and a small paid pilot before bulk execution. Stop when: Success/failure counts, token or local-runtime use and measured cost are recorded. Reserve the last 10 minutes for the optional Wednesday note. |
| Thursday | 90 min | Karpathy, "Building makemore" (part 1) Select material/exercise that fits 60 minutes; use the last 30 for the founder paper. |
| Friday | 90 min | Produce the field completeness table by organism/year with a manually checked missingness sample. Stop when: Not reported, not extracted and unavailable full text remain separate categories. |
| Saturday | 90 min | Resolve the earliest critical spillover or dependency. Prepare any long-form publication draft from existing figures here if needed. Sandbox only after commitments are met. |
| Sunday | 60 min | 20 min build-log draft/publication when authorized; 5 min evidence/checklist; 20 min source-grounded gap review; 15 min next week's six physical actions. |
The source lists more material than necessarily fits. Select exact excerpts for the learning objective and park the remainder; no full-course completion requirement.
0505
Learning specification
05
Learning specification
Biology/domain unit
Source unit: B9 Β· Bioreactors I: modes and balances
Material: NPTEL "Bioreactors" (IIT Madras, Prof. G. K. Suraishkumar), lectures 1-3 β nptel.ac.in (verify current playlist); MIT OCW 10.37 lecture notes on bioreactors as backup
Produce: Mass balances for batch, fed-batch, continuous in a notebook
Understanding check: Your simulator's equations match the lecture's
During preparation, write one worked example connected to the week's actual task, one exercise with a separate answer key and five questions. Peter supplies answers; score explanation quality and flag misconceptions in QUESTIONS. Numeric/scientific conclusions require actual data or explicitly synthetic teaching values.
AI/scientific-method unit
Source unit: M9 Β· Language models from scratch
Material: Karpathy, "Building makemore" (part 1)
Produce: Bigram model on organism names from FermLit
Understanding check: You know what a language model is, in 200 lines
Use the prompt pack: P1 explanation ladder, P2 concept-to-project bridge and P3 quiz. Coding practice belongs within the allocated study/build block. Where the source asks for a favorable scientific result, substitute an honest measured comparison as explained below.
Founder/scientist paper
Select one verified founder/scientific-lead paper relevant to this week's domain. Use P11; save the question, method, numerical result with context, data workflow, three author questions and one connection sentence in founder-paper.md. Keep abstract-only access limitations explicit. On source weeks with no study, prioritize the commercial/submission task and log any skipped digest.
0606
Artifact contracts
06
Artifact contracts
These filenames are outputs to prepare during this week's execution; this scaffold does not claim they already exist. Drafts and measured results have different states. Technical code/data stay in the canonical project repository and are referenced from these coordinating files.
| Artifact | Required content / acceptance | Primary responsibility |
|---|---|---|
corpus-scale-manifest.csv |
Expand the screened corpus toward 2,000 papers; deduplicate preprint/journal versions and record exclusions and license restrictions. Acceptance: Every included paper has a stable identity and eligible full text. | Model assists; Peter checks and owns the outcome |
extraction-cost-report.csv |
Run the selected backend with resumable jobs, retry limits, caching, quality checks and a small paid pilot before bulk execution. Acceptance: Success/failure counts, token or local-runtime use and measured cost are recorded. | Model assists; Peter checks and owns the outcome |
completeness-table.csv |
Produce the field completeness table by organism/year with a manually checked missingness sample. Acceptance: Not reported, not extracted and unavailable full text remain separate categories. | Model assists; Peter checks and owns the outcome |
study-notes.md |
Selected exact free resources; bounded lesson/exercise; separate solution; quiz and grading rubric; Peter's answers and gaps when executed | Model prepares; Peter learns |
founder-paper.md |
Verified source and P11 digest; authentic question and connection sentence; access limitations | Model assists; Peter checks |
branding-pack.md |
Wednesday note, Sunday build log, X adaptation, figure/caption/alt text and the week's special asset; each claim linked to real proof | Model drafts; Peter owns voice/public claims |
opportunity-actions.md |
Qualified target/role, source/date, ladder stage, next action, message/interview/proposal draft and actual status | Model prepares; Peter owns external relationships |
evidence.md |
Actual paths/URLs, versions, checks/metrics, preparation versus execution state and external receipts when applicable | Updated after each deliverable |
review.md |
Checklist, learning assessment, gate status, shortfalls, next actions and carryover | Peter and reviewing model |
During preparation, future measured tables get column definitions, input requirements and run instructions with PENDING status. During execution, replace pending values only with measured outputs. Do not create realistic-looking fake evidence.
0707
Branding and opportunity execution brief
07
Branding and opportunity execution brief
Branding: Draft corpus-scale results with actual N and uncertainty around automated completeness estimates.
Opportunity action: Share a relevant organism-level preliminary figure with an existing contact after verifying source rights and results.
Use career asset contracts. Publish at most the agreed cadence; one figure and one supported number or admitted failure can support multiple drafts. In long-form weeks, prepare a 1,500β2,500-word article from existing evidence within the build/buffer allocation. In release/demo weeks, prepare a 60-second script: problem, input, command/action, result, limitation and proof link.
Verify individuals, jobs and affiliations at execution time. The GridX list and v4 company map are research seeds, not current facts. Do not reveal named company weaknesses or employer/client confidential information. Keep drafted/sent/replied/booked/held statuses separate. The planning request alone does not authorize external messages or publication; honor explicit authorization in the execution session.
0808
Quality risks and week-specific constraints
08
Quality risks and week-specific constraints
Two thousand is a target, not an inclusion rule. Automated failure is not evidence that authors omitted a field; disclose selection bias and stop runs at the agreed budget.
Apply the root scientific evidence contract: provenance; meaningful independent splits; no future-data leakage; baseline comparison; actual denominators/uncertainty; failed cases; human review where required. State whether data are simulated, public experimental, synthetic or partner-provided.
Keep source gates intact, and log scope/time conflicts in review. Missing people, money, access or results must not be replaced with invented evidence. Reduce optional polish first. A specific essential external dependency stays pending while independent preparation continues.
0909
Completion and gate review
09
Completion and gate review
This is an enabling week. Its deliverables feed the next scheduled gate: 13. Complete the acceptance checklist below; do not promote reputation from a draft.
- Monday artifact satisfies: Every included paper has a stable identity and eligible full text.
- Wednesday artifact satisfies: Success/failure counts, token or local-runtime use and measured cost are recorded.
- Friday artifact satisfies: Not reported, not extracted and unavailable full text remain separate categories.
- Study pack is prepared; Peter's actual learning/quiz result is recorded separately.
- Branding and opportunity drafts use supported claims and the correct external-action state.
- Reproduction or document checks are recorded with file/version references.
- This week's special gate, if any, has real evidence or remains explicitly pending.
- Review, root progress/log and the next physical action are updated.
1010
Minimum viable week and recovery
10
Minimum viable week and recovery
Source-preserving minimum: the completeness table.
Operational first step if stalled: open corpus-scale-manifest.csv, write the required inputs and produce the smallest checkable example in ten minutes. If a more urgent missing gate dependency controls the week, use the source minimum above.
If the full week does not fit, use P14: retain one gate-critical deliverable and one directly supporting study exercise; record what is skipped versus moved. Do not mark the original full gate passed merely because the minimum was completed. After a missed week, reforecast from actual evidence and avoid a second unexamined lost week.
1111
Handoff to the next model
11
Handoff to the next model
In review, state exactly what exists, what was verified, what Peter can now explain, which external events remain pending, where the canonical code/data live, and the next file/function or draft paragraph to touch. Link each fact to evidence. Carry scientific assumptions, split definitions and rights constraints forward explicitly.
1212
Ready-to-copy model prompt
12
Ready-to-copy model prompt
Prepare Week 09 of this LABLOOP execution plan.
Read execution-plan/specs.md, execution-plan/DECISIONS.md,
execution-plan/GATES.md and
execution-plan/weeks/week-09-fermlit-scale-up/specs.md, commitment.md, evidence.md and review.md.
Read prior prerequisite reviews and inspect actual repository/data state.
Use v5 as the governing sequence, the v6 Week 09 chapter
(LABLOOP-Master-Plan-v6.md) as the deeper walkthrough, and v4 only for
retained details.
Produce the full local preparation pack and the exact week-specific files named
in the artifact table. Give me a bounded lesson with exercises/answer key,
daily physical actions, technical runbook or draft, branding drafts and
career/commercial actions. Keep the total to 600 minutes.
Separate prepared artifacts from measured results and my learning completion.
Verify sources and do not invent metrics, citations, papers, people or outcomes.
Do not execute external communications, publication or spending unless the
current session already authorizes the specific action.
Finish by updating evidence/review and TODAY with the next physical action.
1313
Preserved original v5 weekly brief
13
Preserved original v5 weekly brief
v6 reproduces this brief unchanged inside v6 Β· Week 9 Β· FermLit at scale. The following is source planning text, not a claim of completion. Apply the explicit evidence corrections in this specification and DECISIONS.md.
Week 9 Β· FermLit at scale
- Goal: 2,000 papers extracted with the measured pipeline.
- Tue (B9): NPTEL bioreactors 1-3; balances in a notebook.
- Thu (M9): Karpathy makemore part 1; bigram on organism names for fun.
- Build: [ ] Mon: corpus to 2,000 papers (same query, more years, plus bioRxiv API for preprints). [ ] Wed: batch extraction with the cheapest backend that meets the F1 floor you set in week 7 (cost table with the v3 telemetry schema). Done when 2,000 JSONs exist. [ ] Fri: completeness dashboard: per field, % of papers that report it. This is the seed of the reporting finding.
- Sun: L-Sun: "2,000 fermentation papers in one table. X% do not report pH. Y% do not report volume." L-Wed.
- Only one thing: the completeness table.