execution-plan/weeks/week-09-fermlit-scale-up/commitment.md

execution-plan/weeks/week-09-fermlit-scale-up/commitment.md Β· UPDATED 2026-09-16

Week 09 commitment

3 parts422 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: fermlit scale up. Minimum that keeps the next gate alive: the completeness table.

01

01

Deliverables to commit

  • corpus-scale-manifest.csv: Every included paper has a stable identity and eligible full text.
  • extraction-cost-report.csv: Success/failure counts, token or local-runtime use and measured cost are recorded.
  • completeness-table.csv: Not reported, not extracted and unavailable full text remain separate categories.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Expand the screened corpus toward 2,000 papers; deduplicate preprint/journal versions and record exclusions and license restrictions. Not set [ ]
Tue 90 Mass balances for batch, fed-batch, continuous in a notebook Not set [ ]
Wed 90 Run the selected backend with resumable jobs, retry limits, caching, quality checks and a small paid pilot before bulk execution. Last ten minutes: optional note. Not set [ ]
Thu 90 Bigram model on organism names from FermLit Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Produce the field completeness table by organism/year with a manually checked missingness sample. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Two thousand is a target, not an inclusion rule. Automated failure is not evidence that authors omitted a field; disclose selection bias and stop runs at the agreed budget.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.

↑ Back to top
⏱ Focus Focus25:00 0 min today