execution-plan/weeks/week-08-technical-report-gate/review.md

execution-plan/weeks/week-08-technical-report-gate/review.md Β· UPDATED 2026-09-16

Week 08 review and handoff

4 parts324 words 5 checkboxes β€” tick them, they save to the file

Review status: NOT_REVIEWED. Specification Β· Evidence

01

01

What was actually completed?

  • MAE/RMSE, N, uncertainty and observation cutoff are logged for both baselines. Evidence: pending.
  • The draft contains data provenance, method, results, limitations and reproduction commands. Evidence: pending.
  • Actual report DOI, public F1 link and five send receipts are required for the source gate. Evidence: pending.
  • Learning assessed from Peter's actual answers. Evidence: pending.
  • Branding/opportunity states recorded correctly. Evidence: pending.
↑ Back to top
02

02

Learning and outcome

What Peter can explain or reproduce now: not assessed. Quiz / teach-back gaps: not assessed. Measured result and limitations: pending. Best evidence link for a scientist/recruiter/buyer: pending. What failed or changed, and why: pending.

↑ Back to top
03

03

Gate and capacity

Gate requirement: Technical report DOI; public per-field F1 table; five founder messages actually sent. Track five conversations as a separate relationship target. Gate status: NOT_STARTED. Original target week: 08. Actual completion date / forecast: not set. Missing external evidence: pending inspection. Blocks completed / 7: not recorded. Days with commits / 7: not recorded. Sunday build log / optional Wednesday note: not recorded. Founder conversations cumulative: not recorded. Earned evidence level and proof: not assessed. Consecutive lost weeks: not assessed.

Week-specific risk to revisit: Report drafting, publishing and micrograd exceed one short block if started from zero. Assemble figures throughout prior weeks, use Saturday for packaging, and leave the gate pending if evidence is incomplete.

↑ Back to top
04

04

Decision and next-model handoff

Continue / recover / blocked: not decided. Retain as the minimum: the report on Zenodo. Skipped permanently with reason: none recorded. Carryover with owner, dependency and target week: none recorded. Canonical repository paths and versions: pending. Data permissions, split definitions or assumptions to preserve: pending. External action authorization that still applies: not assessed. Next physical action, exact file/function/paragraph: pending. Updates to root PROGRESS / LOG / TODAY completed: [ ]

Next week

↑ Back to top
⏱ Focus Focus25:00 0 min today