execution-plan/weeks/week-04-batchlens-first-release/commitment.md Β· UPDATED 2026-09-16
Week 04 commitment
3 parts405 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: batchlens first release. Minimum that keeps the next gate alive: the release with the DOI.
0101
Deliverables to commit
01
Deliverables to commit
-
release-metrics.csv: Definitions, numerator/denominator, N and interval method accompany each metric. -
release-checklist.md: Headline results trace to commands and input checksums. -
review-request.md: Release is ready; public URL and DOI count only when actually issued. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Compute detection delay from fault onset, lead time before harvest, false-alarm rate and undetected fraction on held-out batches. | Not set | [ ] |
| Tue | 90 | Notes; one paragraph "what is a fermentation, really" | Not set | [ ] |
| Wed | 90 | Prepare README, install instructions, CITATION.cff, license and release metadata with a clean-environment reproduction check. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Batch-wise CV implemented in batchlens Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Package batchlens v0.1 and DOI deposit materials; prepare a bounded review request for the Sumble contact. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: A DOI establishes citability, not peer review. Maintain public development from this release for the later JOSS target.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.