# Week 04 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: batchlens first release.
Minimum that keeps the next gate alive: the release with the DOI.

## Deliverables to commit

- [ ] `release-metrics.csv`: Definitions, numerator/denominator, N and interval method accompany each metric.
- [ ] `release-checklist.md`: Headline results trace to commands and input checksums.
- [ ] `review-request.md`: Release is ready; public URL and DOI count only when actually issued.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Compute detection delay from fault onset, lead time before harvest, false-alarm rate and undetected fraction on held-out batches. | Not set | [ ] |
| Tue | 90 | Notes; one paragraph "what is a fermentation, really" | Not set | [ ] |
| Wed | 90 | Prepare README, install instructions, CITATION.cff, license and release metadata with a clean-environment reproduction check. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Batch-wise CV implemented in batchlens Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Package batchlens v0.1 and DOI deposit materials; prepare a bounded review request for the Sumble contact. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: A DOI establishes citability, not peer review. Maintain public development from this release for the later JOSS target.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.