execution-plan/weeks/week-03-statistical-batch-monitoring/commitment.md Β· UPDATED 2026-09-16
Week 03 commitment
3 parts412 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: statistical batch monitoring. Minimum that keeps the next gate alive: TΒ² limits computed.
0101
Deliverables to commit
01
Deliverables to commit
-
monitoring-protocol.md: Limit estimator, sample support and nominal alarm policy are reproducible. -
alarm-examples.csv: Event timing and undetected cases are retained; no cherry-picked pass rule. -
verification-report.md: The smoke run works without network or credentials and numerical invariants are checked. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Estimate PCA Hotelling T2 and SPE control limits using only training/calibration normal batches; choose alarm persistence before evaluating faults. | Not set | [ ] |
| Tue | 90 | Notes + the growth curve drawn by hand with lag, log, stationary, death | Not set | [ ] |
| Wed | 90 | Implement batch replay with timestamped alarms and compare normal/fault cases selected independently of results. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Lab 3 redone on IndPenSim variables Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Check leakage, missing channels and fake-data reproducibility; prepare a one-command monitoring report. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Unfolding a whole batch can leak the future into early warning. Require causal feature availability for every alarm timestamp.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.