execution-plan/weeks/week-02-indpensim-data-and-baseline/commitment.md Β· UPDATED 2026-09-16
Week 02 commitment
3 parts418 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: indpensim data and baseline. Minimum that keeps the next gate alive: the tidy parquet of IndPenSim.
0101
Deliverables to commit
01
Deliverables to commit
-
data-audit.md: Batch/time/variable/value data and a reproducible manifest exist; benchmark simulated origin is explicit. -
alignment-protocol.md: Five relevant variables and any use of future information are documented. -
pca-baseline.md: A reproducible scores plot exists even if faulty batches do not separate. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Record the authoritative IndPenSim source, access terms, checksums and metadata; implement tidy import and count actual available batches. | Not set | [ ] |
| Tue | 90 | Notes + a drawing of a cell making ATP | Not set | [ ] |
| Wed | 90 | Align and unfold batches with an as-of-time rule, inspect units and missingness, and overlay ten trajectories. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Notes Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Fit exploratory PCA on training normal batches and render held-out projections with labels from metadata. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Do not call these real plant batches or require a visually favorable result. The historical download site may fail; use an author-linked source and preserve provenance.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.