Week 23 commitment

3 parts423 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: extremophile candidate ranking. Minimum that keeps the next gate alive: Produce five traceable candidate entries with uncertainty, sequence provenance and partner-relevance rationale.

01

01

Deliverables to commit

  • candidate-source-manifest.csv: Produce five traceable candidate entries with uncertainty, sequence provenance and partner-relevance rationale.
  • ranked-candidates.csv: Every candidate has evidence, confidence limits and limitations; scores are not laboratory results.
  • partner-candidate-dossier.md: Partner can assess feasibility and choose candidates without a hidden model assumption.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Define the partner enzyme family, organism scope and assay-compatible inclusion rules; acquire versioned UniProt records. Not set [ ]
Tue 90 One concise applied note, a worked decision/example and unresolved questions. Not set [ ]
Wed 90 Predict/rank candidates with uncertainty, similarity-to-training and out-of-domain flags; include simple baseline rankings. Last ten minutes: optional note. Not set [ ]
Thu 90 One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Prepare a candidate dossier and collaboration note covering contribution, data access, publication intent and dependencies. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: If partner material is confidential, keep public-data analysis separate. No invented extremophile labels or claims of discovering a superior enzyme.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.