Week 20 commitment

3 parts433 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: paper 2 gate and halfway review. Minimum that keeps the next gate alive: the submission.

01

01

Deliverables to commit

  • gate-20-publication.md: Public ID satisfies the public-preprint gate; endorsement level requires actual endorsement.
  • talk-proposal.md: A specific venue/date or search criteria and a ready proposal exist.
  • halfway-retrospective.md: Every gate has proof or an explicit shortfall; next actions and current roles are documented.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Prepare/submit the finalized Paper 2 package through the verified venue route and record endorsement, receipt and public ID independently. Not set [ ]
Tue 90 A 10-minute self-recorded explanation of Paper 1 for biologists Not set [ ]
Wed 90 Prepare a 20-minute talk proposal with an abstract and evidence links for a relevant LATAM event; track submission and acceptance separately. Last ten minutes: optional note. Not set [ ]
Thu 90 Recorded 10-minute explanation of Paper 2 Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Audit Half 1, update CV/portfolio with actual results, prioritize partner candidates and forecast Half 2 capacity. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: A preprint, an endorsement and peer review are different states. One instrument plus FermLit is the actual Half 1 sequence; trialkit and labdocs remain scheduled for Half 2.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.