# Week 20 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: paper 2 gate and halfway review.
Minimum that keeps the next gate alive: the submission.

## Deliverables to commit

- [ ] `gate-20-publication.md`: Public ID satisfies the public-preprint gate; endorsement level requires actual endorsement.
- [ ] `talk-proposal.md`: A specific venue/date or search criteria and a ready proposal exist.
- [ ] `halfway-retrospective.md`: Every gate has proof or an explicit shortfall; next actions and current roles are documented.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Prepare/submit the finalized Paper 2 package through the verified venue route and record endorsement, receipt and public ID independently. | Not set | [ ] |
| Tue | 90 | A 10-minute self-recorded explanation of Paper 1 for biologists | Not set | [ ] |
| Wed | 90 | Prepare a 20-minute talk proposal with an abstract and evidence links for a relevant LATAM event; track submission and acceptance separately. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Recorded 10-minute explanation of Paper 2 Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Audit Half 1, update CV/portfolio with actual results, prioritize partner candidates and forecast Half 2 capacity. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: A preprint, an endorsement and peer review are different states. One instrument plus FermLit is the actual Half 1 sequence; trialkit and labdocs remain scheduled for Half 2.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.
