Week 19 commitment

3 parts415 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: recruiter portfolio and review. Minimum that keeps the next gate alive: the endorser's yes.

01

01

Deliverables to commit

  • paper-2-venue-decision.md: A dated route and current requirements are recorded without implying endorsement.
  • paper-2-review-response.md: Essential scientific concerns are closed or submission remains blocked.
  • career-launch-pack.md: Each skill claim links to proof; Paper 2 is labeled draft until public.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Confirm endorsement eligibility/status or prepare a scope-checked fallback submission route. Not set [ ]
Tue 90 Notebook run end to end Not set [ ]
Wed 90 Resolve model and human reviews, audit intervals and prepare a five-minute technical defense of Paper 2. Last ten minutes: optional note. Not set [ ]
Thu 90 Every number in Papers 1-2 has an interval Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Prepare a one-screen portfolio, ATS-readable CV, short scientific bio, recruiter message and five tailored application packages. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: v5 asks for two preprints in week 19 although Paper 2 is scheduled for week 20. Use the available draft honestly; current vacancies and company status must be checked at execution.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.