execution-plan/weeks/week-11-fermlit-dataset-engineering/commitment.md

execution-plan/weeks/week-11-fermlit-dataset-engineering/commitment.md Β· UPDATED 2026-09-16

Week 11 commitment

3 parts413 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: fermlit dataset engineering. Minimum that keeps the next gate alive: normalized dataset export.

01

01

Deliverables to commit

  • normalization-audit.md: Conversions have dimensions and assumptions; incompatible percent values are not silently converted to g/L.
  • analysis-plan.md: Exploratory versus planned analyses are distinguished before significance claims.
  • dataset-card-draft.md: A small reload check reproduces row counts and schema; redistribution terms are justified.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Normalize supported concentration/yield units, taxonomy identifiers and duplicates while preserving original strings and provenance. Not set [ ]
Tue 90 kLa estimated from IndPenSim DO data Not set [ ]
Wed 90 Formalize completeness questions and comparison groups; predefine effect sizes and the multiple-testing family for week 14. Last ten minutes: optional note. Not set [ ]
Thu 90 BO on the simulator's feed profile Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Export versioned data and draft the dataset card, known limitations and per-source rights assessment. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: DO time series alone generally do not identify kLa without other information. The study exercise must document identifiability and assumptions or report that estimation is unsupported.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.