Week 06 commitment

3 parts434 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: human gold standard. Minimum that keeps the next gate alive: 50 gold JSONs.

01

01

Deliverables to commit

  • annotation-guidelines.md: Each annotated value has a source sentence and document locator.
  • annotation-progress.csv: Completed and incomplete records are counted, with no model labels passed off as human gold.
  • annotator-brief.md: Gold target is met or shortage logged; external acceptance is evidenced separately.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Write field-by-field definitions, units, examples, ambiguity rules and adjudication procedure; annotate the first 15 papers while timing the first three. Not set [ ]
Tue 90 Notes; Rosalind 5-8 Not set [ ]
Wed 90 Annotate the next 20 target papers independently of model outputs; revise guidelines with versioned ambiguity decisions. Last ten minutes: optional note. Not set [ ]
Thu 90 Notes; a Bayesian update by hand Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Finish the 50-paper target and prepare two annotator invitations for 30 overlapping papers; schedule blinded handoff and return by week 10. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Fifty papers in three build blocks is a feasibility risk. Project time from the first three; use Saturday and request a scope/schedule decision if needed. Never fabricate completion or replace the second human with an LLM.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.