Week 04 commitment

3 parts405 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: batchlens first release. Minimum that keeps the next gate alive: the release with the DOI.

01

01

Deliverables to commit

  • release-metrics.csv: Definitions, numerator/denominator, N and interval method accompany each metric.
  • release-checklist.md: Headline results trace to commands and input checksums.
  • review-request.md: Release is ready; public URL and DOI count only when actually issued.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Compute detection delay from fault onset, lead time before harvest, false-alarm rate and undetected fraction on held-out batches. Not set [ ]
Tue 90 Notes; one paragraph "what is a fermentation, really" Not set [ ]
Wed 90 Prepare README, install instructions, CITATION.cff, license and release metadata with a clean-environment reproduction check. Last ten minutes: optional note. Not set [ ]
Thu 90 Batch-wise CV implemented in batchlens Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Package batchlens v0.1 and DOI deposit materials; prepare a bounded review request for the Sumble contact. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: A DOI establishes citability, not peer review. Maintain public development from this release for the later JOSS target.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.