execution-plan/weeks/week-03-statistical-batch-monitoring/commitment.md

execution-plan/weeks/week-03-statistical-batch-monitoring/commitment.md Β· UPDATED 2026-09-16

Week 03 commitment

3 parts412 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: statistical batch monitoring. Minimum that keeps the next gate alive: TΒ² limits computed.

01

01

Deliverables to commit

  • monitoring-protocol.md: Limit estimator, sample support and nominal alarm policy are reproducible.
  • alarm-examples.csv: Event timing and undetected cases are retained; no cherry-picked pass rule.
  • verification-report.md: The smoke run works without network or credentials and numerical invariants are checked.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Estimate PCA Hotelling T2 and SPE control limits using only training/calibration normal batches; choose alarm persistence before evaluating faults. Not set [ ]
Tue 90 Notes + the growth curve drawn by hand with lag, log, stationary, death Not set [ ]
Wed 90 Implement batch replay with timestamped alarms and compare normal/fault cases selected independently of results. Last ten minutes: optional note. Not set [ ]
Thu 90 Lab 3 redone on IndPenSim variables Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Check leakage, missing channels and fake-data reproducibility; prepare a one-command monitoring report. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Unfolding a whole batch can leak the future into early warning. Require causal feature availability for every alarm timestamp.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.