Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: cockpit and positioning. Minimum that keeps the next gate alive: the cockpit repo with TODAY.md filled for Monday.

01

01

Deliverables to commit

  • profile-baseline.md: Five next actions and an evidence-backed skills baseline exist.
  • environment-checklist.md: A future model has exact setup steps, success checks, and a CPU fallback.
  • positioning.md: Every experience claim is supported or marked for Peter to confirm.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Create the five cockpit files and record a truthful baseline of Python, statistics, biology, portfolio links, and available time. Not set [ ]
Tue 90 A five-line account of the operating rules and the next physical action. Not set [ ]
Wed 90 Specify repository skeletons, environment smoke checks, offline fake mode, secrets handling, and local hardware inventory. Last ten minutes: optional note. Not set [ ]
Thu 90 A five-line account of the operating rules and the next physical action. Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Draft LinkedIn headline/About, GitHub bio, ORCID setup checklist, and two target-role narratives: applied scientist and scientific AI lead. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Do not install an entire infrastructure stack to start learning. Verify Peter's preferred public name and experience claims; dates stay relative until a start Monday is chosen.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.