# Week 00 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: cockpit and positioning.
Minimum that keeps the next gate alive: the `cockpit` repo with `TODAY.md` filled for Monday.

## Deliverables to commit

- [ ] `profile-baseline.md`: Five next actions and an evidence-backed skills baseline exist.
- [ ] `environment-checklist.md`: A future model has exact setup steps, success checks, and a CPU fallback.
- [ ] `positioning.md`: Every experience claim is supported or marked for Peter to confirm.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Create the five cockpit files and record a truthful baseline of Python, statistics, biology, portfolio links, and available time. | Not set | [ ] |
| Tue | 90 | A five-line account of the operating rules and the next physical action. | Not set | [ ] |
| Wed | 90 | Specify repository skeletons, environment smoke checks, offline fake mode, secrets handling, and local hardware inventory. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | A five-line account of the operating rules and the next physical action. Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Draft LinkedIn headline/About, GitHub bio, ORCID setup checklist, and two target-role narratives: applied scientist and scientific AI lead. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Do not install an entire infrastructure stack to start learning. Verify Peter's preferred public name and experience claims; dates stay relative until a start Monday is chosen.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.
