State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: protein study and partner scope. Minimum that keeps the next gate alive: Write paper-3-protocol.md with one testable target, one dataset/split and a concrete partner-call request; run one verified baseline if data are ready.
0101
Deliverables to commit
01
Deliverables to commit
-
paper-3-protocol.md: Write paper-3-protocol.md with one testable target, one dataset/split and a concrete partner-call request; run one verified baseline if data are ready. -
embedding-manifest.csv: Actual memory/runtime fit is measured before a full run; failed sequences are retained. -
protein-baselines.csv: A baseline table and concrete request for scientific input exist. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Write Paper 3 question, target quantity, label context, dataset/split choice and available partner capabilities; create the repository plan. | Not set | [ ] |
| Tue | 90 | One concise applied note, a worked decision/example and unresolved questions. | Not set | [ ] |
| Wed | 90 | Benchmark a small embedding batch, then cache permitted sequences with model/version, pooling, truncation and checksums. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Train ridge/GBM/small-MLP baselines on frozen splits and prepare partner call materials. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: An overnight embedding job is unattended compute, not extra working hours. Thermal proteome measurements are not automatically purified-enzyme stability measurements.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.