graphify-out/2026-09-20/GRAPH_REPORT.md · UPDATED 2026-10-01
Graph Report - biotech_skilling (2026-09-20)
0101
Corpus Check
01
Corpus Check
- 212 files · ~522,974 words
- Verdict: corpus is large enough that graph structure adds value.
- Unclassified: 8 file(s) not represented in the graph (top: .csv 3, .css 3, (none) 1)
0202
Summary
02
Summary
- 2026 nodes · 2795 edges · 219 communities (212 shown, 7 thin omitted)
- Extraction: 100% EXTRACTED · 0% INFERRED · 0% AMBIGUOUS · INFERRED: 13 edges (avg confidence: 0.85)
- Token cost: 0 input · 0 output
0303
Graph Freshness
03
Graph Freshness
- Built from commit:
cc0ba87b - Run
git rev-parse HEADand compare to check if the graph is stale. - Run
graphify update .after code changes (no API cost).
0505
God Nodes (most connected - your core abstractions)
05
God Nodes (most connected - your core abstractions)
PART 6 · Weeks 0-20, block by block- 22 edgesOriginal v5 execution checklist snapshot- 22 edgesApplied AI for Biotech R&D and Biomanufacturing — Upskilling Plan v4- 17 edgesLABLOOP · Master Plan v5 — From program manager to published AI scientist for biotech- 17 edgesACT VIII · Peer review and the crossroads (weeks 36-40)- 17 edgesbuild()- 15 edgesWeek 00 — cockpit and positioning- 14 edgesWeek 01 — fermentation simulator- 14 edgesWeek 02 — indpensim data and baseline- 14 edgesWeek 03 — statistical batch monitoring- 14 edges
0606
Surprising Connections (you probably didn't know these)
06
Surprising Connections (you probably didn't know these)
chat_ask()--calls-->build_prompt()[EXTRACTED] execution-plan/app/app.py → execution-plan/app/consult.pyweek_page()--calls-->index()[EXTRACTED] execution-plan/app/app.py → execution-plan/app/cards.pychat_ask()--calls-->build_context()[EXTRACTED] execution-plan/app/app.py → execution-plan/app/consult.pyweek_chapters()--calls-->chapters()[EXTRACTED] execution-plan/app/consult.py → execution-plan/app/cards.pymatching_cards()--calls-->index()[EXTRACTED] execution-plan/app/consult.py → execution-plan/app/cards.py
0808
Communities (219 total, 7 thin omitted)
08
Communities (219 total, 7 thin omitted)
Community 0 - "README.md"
Cohesion: 0.07 Nodes (3): Block log, Learning questions, Weekly folder index
Community 1 - "consult.py"
Cohesion: 0.11 Nodes (27): build_context(), build_prompt(), expand(), graph_hits(), matching_cards(), passages(), The plan consultant: find the parts of the programme a question touches, then…, graphify's view: which files and which named nodes this question lands on. (+19 more)
Community 2 - "Applied AI for Biotech R&D and Biomanufacturing — Upskilling Plan v4"
Cohesion: 0.04 Nodes (45): 0. Read this first (what changed and why), 10. Hardware, software and budget, 11. Metrics and gates, 12. Ignore for now, 13. Execution protocol, 14. The one thing to remember, 1. Thesis, 2. Strategy: how the dots connect (+37 more)
Community 3 - "LABLOOP · Master Plan v6 — The Cartographer's Path: from program manager to published AI scientist for biotech"
Cohesion: 0.06 Nodes (35): 0.1 The honest answer to your question, 0.2 The cockpit: five files, nothing else, 0.3 The rituals (this is the ADHD armor), 0.4 Weekly shape (never changes for 40 weeks), 3.1 Like a kid, 3.2 Like a reviewer, 4.1 Track B · Biology from zero (Tuesdays, ~30 h in Half 1), 4.2 Track M · AI science from the basics (Thursdays, ~30 h in Half 1) (+27 more)
Community 4 - "Original v5 execution checklist snapshot"
Cohesion: 0.08 Nodes (26): Original v5 execution checklist snapshot, PART 7 · Weeks 21-40, week by week (Half 2: depth, co-author, money), Programme progress, Sunday scorecard, Week 0 · Cockpit and positioning, Week 10 · Inter-annotator agreement and the first real analysis, Week 11 · Dataset engineering and the reporting finding, Week 12 · Endorsement route opens; hybrid model v0 (+18 more)
Community 5 - "ACT VIII · Peer review and the crossroads (weeks 36-40)"
Cohesion: 0.09 Nodes (23): 9.1 Profiles (week 0, updated at each gate), 9.2 Content pillars and cadence (same as v4, re-pointed), 9.3 The connection ladder (founders and scientists), 9.4 Connection ladder (established companies, funds, scientific-data companies), 9.5 arXiv endorsement: three parallel routes (start week 12), 9.6 Templates (reuse v4 section 9 for build log, gap note, video, targeted message, audit one-pager), ACT VIII · Peer review and the crossroads (weeks 36-40), APPENDIX V6-A · The NotebookLM calendar at a glance (+15 more)
Community 6 - "PART 6 · Weeks 0-20, block by block"
Cohesion: 0.09 Nodes (22): PART 6 · Weeks 0-20, block by block, Week 0 · Cockpit and positioning, Week 10 · Inter-annotator agreement and the first real analysis, Week 11 · Dataset engineering and the reporting finding, Week 12 · Endorsement route opens; hybrid model v0, Week 13 · GATE 13: FermLit v0.5 public, Paper 1 outlined, Week 14 · Write Paper 1, Week 15 · Review, revise, human read (+14 more)
Community 7 - "Week 00 — cockpit and positioning"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 8 - "Week 01 — fermentation simulator"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 9 - "Week 02 — indpensim data and baseline"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 10 - "Week 03 — statistical batch monitoring"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 11 - "Week 04 — batchlens first release"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 12 - "Week 05 — fermlit corpus and schema"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 13 - "Week 06 — human gold standard"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 14 - "Week 07 — measured extraction agent"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 15 - "Week 08 — technical report gate"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 16 - "Week 09 — fermlit scale up"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 17 - "Week 10 — annotation agreement and analysis"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 18 - "Week 11 — fermlit dataset engineering"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 19 - "Week 12 — endorsement and hybrid model"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 20 - "Week 13 — fermlit release and paper outline"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 21 - "Week 14 — paper 1 full draft"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 22 - "Week 15 — paper 1 review and revision"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 23 - "Week 16 — paper 1 preprint gate"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 24 - "Week 17 — paper 2 complete experiments"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 25 - "Week 18 — paper 2 full draft"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 26 - "Week 19 — recruiter portfolio and review"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 27 - "Week 20 — paper 2 gate and halfway review"
Cohesion: 0.11 Nodes (18): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+10 more)
Community 28 - "Week 21 — protein study and partner scope"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 29 - "Week 22 — protein validation and baselines"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 30 - "Week 23 — extremophile candidate ranking"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 31 - "Week 24 — coauthor and validation gate"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 32 - "Week 25 — trialkit field module"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 33 - "Week 26 — trialkit plate module"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 34 - "Week 27 — loop audit offer and pipeline"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 35 - "Week 28 — first invoice gate"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 36 - "Week 29 — audit delivery or sales recovery"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 37 - "Week 30 — audit readout and validation results"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 38 - "Week 31 — paper 3 coauthor draft"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 39 - "Week 32 — paper 3 gate and career refresh"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 40 - "Week 33 — labdocs ingestion and traceability"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 41 - "Week 34 — labdocs retrieval evaluation"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 42 - "Week 35 — labdocs release and local benchmark"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 43 - "Week 36 — journal and joss submissions"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 44 - "Week 37 — pilot or job process"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 45 - "Week 38 — scientific talk and proof"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 46 - "Week 39 — fund portfolio offer"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 47 - "Week 40 — final retrospective and career decision"
Cohesion: 0.12 Nodes (17): AI/scientific-method unit, Artifact contracts, Biology/domain unit, Branding and opportunity execution brief, Completion and gate review, Deeper walkthrough (v6), Founder/scientist paper, Handoff to the next model (+9 more)
Community 48 - "app.js"
Cohesion: 0.22 Nodes (8): account(), book(), embed(), folderPicker(), openEditor(), renderLists(), renderTimer(), ytId()
Community 49 - "week-04-batchlens-first-release/materials.md"
Cohesion: 0.09 Nodes (20): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 04 commitment, Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 04 evidence register (+12 more)
Community 50 - "Week 13 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 13 review and handoff, What was actually completed?
Community 51 - "Week 14 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 14 review and handoff, What was actually completed?
Community 52 - "Week 15 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 15 review and handoff, What was actually completed?
Community 53 - "Week 16 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 16 review and handoff, What was actually completed?
Community 54 - "Week 17 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 17 review and handoff, What was actually completed?
Community 55 - "Week 18 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 18 review and handoff, What was actually completed?
Community 56 - "Week 24 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 24 review and handoff, What was actually completed?
Community 57 - "Week 28 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 28 review and handoff, What was actually completed?
Community 58 - "Week 31 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 31 review and handoff, What was actually completed?
Community 59 - "Week 33 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 33 review and handoff, What was actually completed?
Community 60 - "Week 35 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 35 review and handoff, What was actually completed?
Community 61 - "Week 36 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 36 review and handoff, What was actually completed?
Community 62 - "Week 37 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 37 review and handoff, What was actually completed?
Community 63 - "LABLOOP · Master Plan v5 — From program manager to published AI scientist for biotech"
Cohesion: 0.18 Nodes (11): LABLOOP · Master Plan v5 — From program manager to published AI scientist for biotech, PART 10 · Money (unchanged in substance from v4, moved to Half 2), PART 11 · Rescue protocols (for the days the plan meets your brain), PART 12 · Gates and metrics (the only numbers you track), PART 13 · Ignore for 40 weeks, PART 14 · Day 0 (tomorrow), minute by minute, PART 15 · The one thing to remember, PART 1 · The strategy in one picture (+3 more)
Community 64 - "ACT IV · Becoming an author (weeks 14-20)"
Cohesion: 0.22 Nodes (9): ACT IV · Becoming an author (weeks 14-20), PART 7 · Weeks 21-40 as chapters (depth, co-author, money), Week 14 · Write Paper 1, Week 15 · Review, revise, human read, Week 16 · GATE 16: Paper 1 on bioRxiv (L3), Week 17 · Paper 2 experiments, complete, Week 18 · Write Paper 2, Week 19 · Endorsement closed; review; site (+1 more)
Community 65 - "ACT VI · The first client (weeks 25-32)"
Cohesion: 0.22 Nodes (9): ACT VI · The first client (weeks 25-32), Week 25 · Instrument 2 trialkit (field module), Week 26 · Instrument 2 (plate module), Week 27 · Loop Audit offer, built on papers, Week 28 · GATE 28: first Loop Audit sold, Week 29 · Audit delivery 1, Week 30 · Audit delivery 2; Paper 3 results, Week 31 · Write Paper 3 (+1 more)
Community 66 - "Instructions for any model preparing or executing this plan"
Cohesion: 0.25 Nodes (8): Capacity and block shape, Commercial and career evidence, Completion and recovery, Default request: prepare one week, Instructions for any model preparing or executing this plan, Ownership and authority, Scientific evidence contract, Scope and source hierarchy
Community 67 - "Sources and resource verification"
Cohesion: 0.29 Nodes (7): Checks performed on 2026-09-12, Curriculum locator catalog, Known unverified on 2026-09-15, carried with a (verify) mark, Links confirmed through search on 2026-09-15, Local source register, Sources and resource verification, Weeks 00–04 reading and viewing lists (added 2026-09-15)
Community 68 - "Week 01 — Materials: what to read, what to watch"
Cohesion: 0.29
Nodes (7): Deeper — Saturday sandbox only, Link check log — 2026-09-15, NotebookLM kit sources for LABLOOP-W01, Read, Watch (YouTube), Week 01 — Materials: what to read, what to watch, Where this fits in the week (600-minute cap respected)
Community 69 - "doc_view"
Cohesion: 0.19 Nodes (16): doc_page(), doc_parts(), doc_path(), doc_save(), doc_task(), doc_view(), mark_tasks(), Resolve a library path, refusing anything outside ROOT, non-Markdown or inside… (+8 more)
Community 70 - "Week 03 — Materials: what to read, what to watch"
Cohesion: 0.29
Nodes (7): Deeper — Saturday sandbox only, Link check log — 2026-09-15, NotebookLM kit sources for LABLOOP-W03, Read, Watch (YouTube), Week 03 — Materials: what to read, what to watch, Where this fits in the week
Community 71 - "PART 9 · Branding, connection ladder, endorsement"
Cohesion: 0.29 Nodes (7): 9.1 Profiles (week 0, updated at each gate), 9.2 Content pillars and cadence (same as v4, re-pointed), 9.3 The connection ladder (founders and scientists), 9.4 Connection ladder (established companies, funds, scientific-data companies), 9.5 arXiv endorsement: three parallel routes (start week 12), 9.6 Templates (reuse v4 section 9 for build log, gap note, video, targeted message, audit one-pager), PART 9 · Branding, connection ladder, endorsement
Community 72 - "ACT I · The apprentice learns the tank (weeks 0-4)"
Cohesion: 0.33 Nodes (6): ACT I · The apprentice learns the tank (weeks 0-4), Week 0 · Cockpit and positioning, Week 1 · A tank in 80 lines, Week 2 · One hundred real batches, Week 3 · Golden batch, with statistics, Week 4 · L1: public and reproducible
Community 73 - "ACT III · From sample to census (weeks 9-13)"
Cohesion: 0.33 Nodes (6): ACT III · From sample to census (weeks 9-13), Week 10 · Inter-annotator agreement and the first real analysis, Week 11 · Dataset engineering and the reporting finding, Week 12 · Endorsement route opens; hybrid model v0, Week 13 · GATE 13: FermLit v0.5 public, Paper 1 outlined, Week 9 · FermLit at scale
Community 74 - "Week 00 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 00 commitment
Community 75 - "Week 00 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 00 review and handoff, What was actually completed?
Community 76 - "Week 01 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 01 review and handoff, What was actually completed?
Community 77 - "Week 02 — Materials: what to read, what to watch"
Cohesion: 0.29
Nodes (7): Deeper — Saturday sandbox only, Link check log — 2026-09-15, NotebookLM kit sources for LABLOOP-W02, Read, Watch (YouTube), Week 02 — Materials: what to read, what to watch, Where this fits in the week
Community 78 - "Week 03 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 03 review and handoff, What was actually completed?
Community 79 - "mitocondria-model.test.cjs"
Cohesion: 0.10 Nodes (21): advance(), applyAction(), challengeComplete(), initialState(), restoreState(), unavailable(), assert, { chromium } (+13 more)
Community 80 - "mitocondria-game.js"
Cohesion: 0.20 Nodes (22): act(), animateAction(), animateNode(), answer(), clearFeedback(), finishAnimations(), next(), openInfo() (+14 more)
Community 81 - "Week 05 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 05 commitment
Community 82 - "Week 05 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 05 review and handoff, What was actually completed?
Community 83 - "Week 06 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 06 commitment
Community 84 - "Week 06 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 06 review and handoff, What was actually completed?
Community 85 - "Week 07 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 07 commitment
Community 86 - "Week 07 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 07 review and handoff, What was actually completed?
Community 87 - "Week 08 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 08 commitment
Community 88 - "Week 08 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 08 review and handoff, What was actually completed?
Community 89 - "Week 09 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 09 commitment
Community 90 - "Week 09 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 09 review and handoff, What was actually completed?
Community 91 - "Week 10 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 10 commitment
Community 92 - "Week 10 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 10 review and handoff, What was actually completed?
Community 93 - "Week 11 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 11 commitment
Community 94 - "Week 11 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 11 review and handoff, What was actually completed?
Community 95 - "Week 12 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 12 commitment
Community 96 - "Week 12 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 12 review and handoff, What was actually completed?
Community 97 - "Week 13 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 13 commitment
Community 98 - "Week 14 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 14 commitment
Community 99 - "Week 15 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 15 commitment
Community 100 - "Week 16 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 16 commitment
Community 101 - "Week 17 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 17 commitment
Community 102 - "Week 18 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 18 commitment
Community 103 - "Week 19 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 19 commitment
Community 104 - "Week 19 review and handoff"
Cohesion: 0.18 Nodes (9): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 19 evidence register, Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 19 review and handoff (+1 more)
Community 105 - "Week 20 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 20 commitment
Community 106 - "Week 20 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 20 review and handoff, What was actually completed?
Community 107 - "Week 21 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 21 commitment
Community 108 - "Week 21 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 21 review and handoff, What was actually completed?
Community 109 - "Week 22 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 22 commitment
Community 110 - "Week 22 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 22 review and handoff, What was actually completed?
Community 111 - "Week 23 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 23 commitment
Community 112 - "Week 23 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 23 review and handoff, What was actually completed?
Community 113 - "Week 24 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 24 commitment
Community 114 - "Week 25 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 25 commitment
Community 115 - "Week 25 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 25 review and handoff, What was actually completed?
Community 116 - "Week 26 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 26 commitment
Community 117 - "Week 26 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 26 review and handoff, What was actually completed?
Community 118 - "Week 27 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 27 commitment
Community 119 - "Week 27 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 27 review and handoff, What was actually completed?
Community 120 - "Week 28 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 28 commitment
Community 121 - "Week 29 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 29 commitment
Community 122 - "Week 29 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 29 review and handoff, What was actually completed?
Community 123 - "Week 30 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 30 commitment
Community 124 - "Week 30 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 30 review and handoff, What was actually completed?
Community 125 - "Week 31 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 31 commitment
Community 126 - "Week 32 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 32 commitment
Community 127 - "Week 32 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 32 review and handoff, What was actually completed?
Community 128 - "Week 33 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 33 commitment
Community 129 - "Week 34 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 34 commitment
Community 130 - "Week 34 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 34 review and handoff, What was actually completed?
Community 131 - "Week 35 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 35 commitment
Community 132 - "Week 36 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 36 commitment
Community 133 - "Week 37 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 37 commitment
Community 134 - "Week 38 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 38 commitment
Community 135 - "Week 38 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 38 review and handoff, What was actually completed?
Community 136 - "Week 39 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 39 commitment
Community 137 - "Week 39 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 39 review and handoff, What was actually completed?
Community 138 - "Week 40 commitment"
Cohesion: 0.40 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 40 commitment
Community 139 - "Week 40 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 40 review and handoff, What was actually completed?
Community 140 - "PART 0 · How to use this document (read this every Monday for the first month)"
Cohesion: 0.40 Nodes (5): 0.1 The honest answer to your question, 0.2 The cockpit: five files, nothing else, 0.3 The rituals (this is the ADHD armor), 0.4 Weekly shape (never changes for 40 weeks), PART 0 · How to use this document (read this every Monday for the first month)
Community 141 - "PART 4 · Curriculum from zero (four tracks, all free, exact units)"
Cohesion: 0.40 Nodes (5): 4.1 Track B · Biology from zero (Tuesdays, ~30 h in Half 1), 4.2 Track M · AI science from the basics (Thursdays, ~30 h in Half 1), 4.3 Track D · Domain and craft (inside build blocks, no separate hours), 4.4 Track F · Founder papers (Thursday, last 30 minutes), PART 4 · Curriculum from zero (four tracks, all free, exact units)
Community 142 - "PART 5 · Repos and materials to prepare (day 0 to week 2)"
Cohesion: 0.40 Nodes (5): 5.1 Repositories, 5.2 README skeleton (same for every instrument repo), 5.3 Local environment (day 0, one block), 5.4 Annotation kit for FermLit (week 6), PART 5 · Repos and materials to prepare (day 0 to week 2)
Community 143 - "ACT II · The reading robot (weeks 5-8)"
Cohesion: 0.40 Nodes (5): ACT II · The reading robot (weeks 5-8), Week 5 · FermLit begins: the corpus, Week 6 · The gold set (the most important week of Half 1), Week 7 · The extraction agent, measured, Week 8 · GATE 8: technical report and L2
Community 144 - "ACT V · The protein detective finds a partner (weeks 21-24)"
Cohesion: 0.40 Nodes (5): ACT V · The protein detective finds a partner (weeks 21-24), Week 21 · Paper 3 scoped with a partner, Week 22 · Baselines beaten honestly, Week 23 · Extremophile focus, Week 24 · GATE 24: co-authorship agreed
Community 145 - "Talent and commercial asset requirements"
Cohesion: 0.50 Nodes (4): Asset contracts, Required asset milestones, Talent and commercial asset requirements, Two hiring narratives to prepare
Community 146 - "Commands for App"
Cohesion: 0.50 Nodes (3): Commands for App, Next actions, Notes
Community 147 - "LABLOOP: week-by-week execution"
Cohesion: 0.50 Nodes (4): Governing documents, How to use it, LABLOOP: week-by-week execution, Weekly map
Community 148 - "environment-checklist.md"
Cohesion: 0.50 Nodes (3): environment-checklist.md, Next actions, Notes
Community 149 - "Branding pack"
Cohesion: 0.50 Nodes (3): Branding pack, Next actions, Notes
Community 150 - "Environment checklist"
Cohesion: 0.50 Nodes (3): Environment checklist, Next actions, Notes
Community 151 - "Week 09 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 09 evidence register
Community 152 - "Founder paper"
Cohesion: 0.50 Nodes (3): Founder paper, Next actions, Notes
Community 153 - "Opportunity actions"
Cohesion: 0.50 Nodes (3): Next actions, Notes, Opportunity actions
Community 154 - "Positioning"
Cohesion: 0.50 Nodes (3): Next actions, Notes, Positioning
Community 155 - "Study notes"
Cohesion: 0.50 Nodes (3): Next actions, Notes, Study notes
Community 156 - "Week 01 commitment"
Cohesion: 0.50 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 01 commitment
Community 157 - "Week 01 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 01 evidence register
Community 158 - "app.py"
Cohesion: 0.15
Nodes (20): dashboard(), date(), focus_between(), folder_of(), folders(), LABLOOP study cockpit. Run python app.py, then open http://127.0.0.1:5000, Measured minutes inside one programme week (its Monday through its Sunday)., slug() (+12 more)
Community 159 - "Week 00 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 00 evidence register
Community 160 - "Week 03 commitment"
Cohesion: 0.50 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 03 commitment
Community 161 - "Week 03 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 03 evidence register
Community 162 - "Week 27 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 27 evidence register
Community 163 - "Week 06 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 06 evidence register
Community 164 - "Week 07 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 07 evidence register
Community 165 - "Week 08 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 08 evidence register
Community 166 - "cards.py"
Cohesion: 0.11 Nodes (26): blocks(), build(), chapters(), _fold(), Resource library: turns the v6 master plan and the weekly materials files into…, {week number: chapter text} from the v6 master plan., The bold labels v6 uses inside every chapter ('Welcome.', 'Learn it.', …) ->…, Every card in the programme, plus the per-week context /now needs. (+18 more)
Community 167 - "_materials_cards"
Cohesion: 0.13 Nodes (23): _bullets(), _clean(), _day(), _kind(), _learn_cards(), _materials_cards(), _mins(), Where this fits in the week' -> {ref: which day, which slot, which position in… (+15 more)
Community 168 - "Week 11 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 11 evidence register
Community 169 - "Week 12 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 12 evidence register
Community 170 - "Week 02 review and handoff"
Cohesion: 0.40 Nodes (5): Decision and next-model handoff, Gate and capacity, Learning and outcome, Week 02 review and handoff, What was actually completed?
Community 171 - "Week 20 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 20 evidence register
Community 172 - "post"
Cohesion: 0.13 Nodes (25): context_processor, card_action(), chat_ask(), chat_job(), chat_log(), doc_move(), doc_pin(), focus_action() (+17 more)
Community 173 - "Week 22 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 22 evidence register
Community 174 - "Week 23 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 23 evidence register
Community 175 - "Week 25 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 25 evidence register
Community 176 - "Week 05 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 05 evidence register
Community 177 - "index"
Cohesion: 0.22 Nodes (12): card_view(), chat_page(), current_week(), files(), learn_page(), now_page(), pick(), One card for the next block: unfinished, inside the time budget, nearest to… (+4 more)
Community 178 - "git_sync"
Cohesion: 0.31
Nodes (11): after_request, count_interaction(), git(), git_sync(), pending(), {interactions, pushed: {commit: push time}}; update(state) mutates it under a…, Commit every change and push. The counter resets once the commit is in., sync_page() (+3 more)
Community 179 - "Week 30 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 30 evidence register
Community 180 - "doc_rel"
Cohesion: 0.28 Nodes (9): doc_folders(), doc_list(), doc_new(), doc_rel(), doc_title(), library(), place(), Every folder a document can live in, as paths relative to ROOT ('' is the… (+1 more)
Community 181 - "Week 33 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 33 evidence register
Community 182 - "Week 38 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 38 evidence register
Community 183 - "Week 39 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 39 evidence register
Community 184 - "Week 13 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 13 evidence register
Community 185 - "ACT VII · The lab's memory (weeks 33-35)"
Cohesion: 0.50 Nodes (4): ACT VII · The lab's memory (weeks 33-35), Week 33 · Instrument 3 labdocs, part 1, Week 34 · labdocs, part 2, Week 35 · labdocs, part 3
Community 187 - "Source reconciliation and feasibility decisions"
Cohesion: 0.67 Nodes (3): Assumptions left visible, Capacity decisions to make during execution, Source reconciliation and feasibility decisions
Community 189 - "PART 3 · The scientific thesis (explained twice: like a kid, then like a reviewer)"
Cohesion: 0.67 Nodes (3): 3.1 Like a kid, 3.2 Like a reviewer, PART 3 · The scientific thesis (explained twice: like a kid, then like a reviewer)
Community 195 - "Week 35 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 35 evidence register
Community 196 - "md"
Cohesion: 0.25
Nodes (8): heading_ids(), href(), link_mentions(), one(), md(), Relative Markdown link -> app URL. Markdown goes to the reader/editor, anything…, Backticked file.md mentions -> open/edit link. A weekly deliverable that is…, GitHub-compatible anchors on headings, so file.md#some-heading links land in…
Community 197 - "Week 02 commitment"
Cohesion: 0.50 Nodes (4): Deliverables to commit, Dependency and capacity check, Proposed calendar, Week 02 commitment
Community 198 - "Week 16 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 16 evidence register
Community 199 - "Week 14 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 14 evidence register
Community 200 - "Week 15 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 15 evidence register
Community 201 - "Week 21 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 21 evidence register
Community 202 - "Week 17 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 17 evidence register
Community 203 - "Week 18 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 18 evidence register
Community 204 - "Week 24 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 24 evidence register
Community 205 - "chatrunner.py"
Cohesion: 0.22 Nodes (9): datetime, finish(), main(), Runs one consultant question through opencode and writes the answer to its job…, json, pathlib, re, subprocess (+1 more)
Community 206 - "Week 31 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 31 evidence register
Community 207 - "Week 02 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 02 evidence register
Community 208 - "Week 26 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 26 evidence register
Community 209 - "Week 36 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 36 evidence register
Community 210 - "Week 37 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 37 evidence register
Community 211 - "asset"
Cohesion: 0.67 Nodes (3): asset(), Static URL stamped with the file's mtime, so an edited stylesheet or script is…, template_global
Community 212 - "Week 40 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 40 evidence register
Community 213 - "qs"
Cohesion: 0.67 Nodes (3): qs(), Filter chips rebuild the current query string with one key changed., template_filter
Community 214 - "Week 28 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 28 evidence register
Community 215 - "Week 32 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 32 evidence register
Community 216 - "Week 34 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 34 evidence register
Community 217 - "Week 10 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 10 evidence register
Community 218 - "Week 29 evidence register"
Cohesion: 0.50 Nodes (4): Actual learning and decisions, External events, when authorized and actually performed, Reproduction and scientific measurements, Week 29 evidence register
0909
Knowledge Gaps
09
Knowledge Gaps
- 1298 isolated node(s):
{ chromium },assert,{ pathToFileURL },path,test(+1293 more) These have ≤1 connection - possible missing edges or undocumented components. (Counts symbols only; 1396 node(s) total have ≤1 connection when file, concept and rationale nodes are included.) - 7 thin communities (<3 nodes) omitted from report — run
graphify queryto explore isolated nodes.
1010
Suggested Questions
10
Suggested Questions
Questions this graph is uniquely positioned to answer:
- Why does
LABLOOP · Master Plan v5 — From program manager to published AI scientist for biotechconnectLABLOOP · Master Plan v5 — From program manager to published AI scientist for biotechtoREADME.md,PART 6 · Weeks 0-20, block by block,PART 9 · Branding, connection ladder, endorsement,PART 0 · How to use this document (read this every Monday for the first month),PART 4 · Curriculum from zero (four tracks, all free, exact units),PART 5 · Repos and materials to prepare (day 0 to week 2),PART 3 · The scientific thesis (explained twice: like a kid, then like a reviewer)? High betweenness centrality (0.047) - this node is a cross-community bridge. - Why does
Applied AI for Biotech R&D and Biomanufacturing — Upskilling Plan v4connectApplied AI for Biotech R&D and Biomanufacturing — Upskilling Plan v4toREADME.md? High betweenness centrality (0.034) - this node is a cross-community bridge. - Why does
ACT VIII · Peer review and the crossroads (weeks 36-40)connectACT VIII · Peer review and the crossroads (weeks 36-40)toREADME.md? High betweenness centrality (0.034) - this node is a cross-community bridge. - What connects
{ chromium },assert,{ pathToFileURL }to the rest of the system? 1298 weakly-connected nodes found - possible documentation gaps or missing edges. - Should
README.mdbe split into smaller, more focused modules? Cohesion score 0.06545086119554204 - nodes in this community are weakly interconnected. - Should
consult.pybe split into smaller, more focused modules? Cohesion score 0.11375661375661375 - nodes in this community are weakly interconnected. - Should
Applied AI for Biotech R&D and Biomanufacturing — Upskilling Plan v4be split into smaller, more focused modules? Cohesion score 0.044444444444444446 - nodes in this community are weakly interconnected.