Week 24 commitment

3 parts442 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: coauthor and validation gate. Minimum that keeps the next gate alive: Prepare the validation protocol and obtain the scientist's written agreement; if agreement is absent, log the unmet gate and computational fallback.

01

01

Deliverables to commit

  • validation-plan.md: Partner owns wet-lab feasibility; success/failure criteria are fixed before outcomes.
  • collaboration-agreement-draft.md: Prepare the validation protocol and obtain the scientist's written agreement; if agreement is absent, log the unmet gate and computational fallback.
  • gate-24-evidence.md: Written agreement and a timestamped validation plan support the source gate.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Turn partner feedback into a 5–10-candidate validation proposal with controls, assay endpoint, replicates, conditions and responsibilities. Not set [ ]
Tue 90 One concise applied note, a worked decision/example and unresolved questions. Not set [ ]
Wed 90 Draft contribution/authorship/data-sharing and publication expectations, timeline and a computational-only fallback. Last ten minutes: optional note. Not set [ ]
Thu 90 One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Version the agreed protocol before assays and record expected sample/results dates plus the analysis plan. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Authorship requires real contribution and final manuscript approval. No partner by this gate triggers a documented computational-only route; it does not satisfy the co-authored milestone.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.