Week 16 commitment
3 parts418 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: paper 1 preprint gate. Minimum that keeps the next gate alive: the submission.
0101
Deliverables to commit
01
Deliverables to commit
-
paper-1-final-audit.md: The author-approved manuscript has no unresolved essential evidence gaps. -
paper-1-submission-record.md: Submission is documented; L3 is recorded only after a public preprint exists. -
paper-1-amplification.md: Every draft uses the real public link or clearly says manuscript/submitted. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Incorporate received human review, finalize author/affiliation/availability details and verify the venue's current scope and submission requirements. | Not set | [ ] |
| Tue | 90 | ESM-2 650M running on the 3050, embedding 100 sequences | Not set | [ ] |
| Wed | 90 | Prepare the bioRxiv submission package and track receipt, moderation and public identifier as distinct states. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Conformal intervals on the soft sensor Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Draft the nontechnical article, truthful profile update and messages to ten existing founder contacts, three employers and the GridX contact. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Public availability depends on moderation. Protein embeddings this week are a bounded smoke check; record actual VRAM/runtime and use a smaller documented checkpoint if needed.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.