execution-plan/weeks/week-12-endorsement-and-hybrid-model/commitment.md Β· UPDATED 2026-09-16
Week 12 commitment
3 parts431 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: endorsement and hybrid model. Minimum that keeps the next gate alive: the three endorsement messages.
0101
Deliverables to commit
01
Deliverables to commit
-
endorsement-route.md: Three specific messages are ready; record actual sending and replies only if performed. -
hybrid-design.md: Mechanistic, pure ML and hybrid feature/target definitions are explicit. -
experiment-matrix.csv: A smoke run validates split isolation; full results may finish in week 17. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Prepare three endorsement/collaboration routes with verified category eligibility, paper summaries and the best available evidence link. | Not set | [ ] |
| Tue | 90 | Glossary: CPP, CQA, design space, golden batch, in your words | Not set | [ ] |
| Wed | 90 | Fit a mechanistic baseline and residual GBM using training data and information available at prediction time; compare on ten training batches. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | SINDy recovers Monod from simulator data Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Build the 5/10/20/50-batch, five-seed learning-curve harness with fixed held-out groups and feasible data counts. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Fitting mechanistic parameters to a full held-out trajectory leaks future labels. SINDy needs an appropriate function library and identifiability check; recovering exact Monod kinetics is an experiment, not a guaranteed study outcome.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.