Week 08 commitment

3 parts430 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: technical report gate. Minimum that keeps the next gate alive: the report on Zenodo.

01

01

Deliverables to commit

  • softsensor-benchmark.csv: MAE/RMSE, N, uncertainty and observation cutoff are logged for both baselines.
  • technical-report-outline.md: The draft contains data provenance, method, results, limitations and reproduction commands.
  • gate-08-checklist.md: Actual report DOI, public F1 link and five send receipts are required for the source gate.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Benchmark PLS and LightGBM titer prediction at 25/50/75 percent of observable batch time with grouped splits and an explicit forecast target. Not set [ ]
Tue 90 A 2-page "biology for my thesis" summary Not set [ ]
Wed 90 Write the 8–10 page technical report from existing figures and methods, review claims, and include FermLit evaluation evidence separately. Last ten minutes: optional note. Not set [ ]
Thu 90 micrograd rewritten from memory Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Prepare batchlens v0.2, the report deposit, public field-score table and five personalized founder messages. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: Report drafting, publishing and micrograd exceed one short block if started from zero. Assemble figures throughout prior weeks, use Saturday for packaging, and leave the gate pending if evidence is incomplete.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.