execution-plan/weeks/week-01-fermentation-simulator/commitment.md Β· UPDATED 2026-09-16
Week 01 commitment
3 parts432 words
6 checkboxes β tick them, they save to the file
State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification
Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: fermentation simulator.
Minimum that keeps the next gate alive: monod.py with the plot.
0101
Deliverables to commit
01
Deliverables to commit
-
simulator-design.md: A repeatable trajectory and balance checks exist; any lag-phase behavior is explicitly modeled. -
telemetry-demo.md: A timestamped sample can be traced from generator to rendered curve. -
simulation-manifest.csv: Twenty reproducible outputs have known ground truth and no implied plant validation. - Bounded learning exercise and personal teach-back.
- Evidence-backed branding and opportunity pack.
- Sunday review and next physical action.
0202
Proposed calendar
02
Proposed calendar
| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---|---|---|---|
| Mon | 90 | Implement X/S/P/DO balances, feed and volume terms, named parameters and units; document the scope of the simplified simulator. | Not set | [ ] |
| Tue | 90 | 1 page of notes in notes/bio/B1.md + 5 questions |
Not set | [ ] |
| Wed | 90 | Replay simulator measurements through MQTT to a local time-series store and a minimal graph; provide CSV replay if the Debian box is unavailable. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | Notes; numpy re-doing 3 examples Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Generate 20 seeded batches including a labeled feed-stop fault; save configuration, label and generator version. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |
0303
Dependency and capacity check
03
Dependency and capacity check
- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: A basic Monod model does not automatically produce lag and death phases. Eighty lines is a presentation idea, not a correctness criterion; do not force artificial physiology to match the title.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.
Peter's commitment / adjustments: pending. Reviewing model and date: pending.