Week 01 commitment

3 parts432 words 6 checkboxes β€” tick them, they save to the file

State: UNCONFIRMED. Owner: Peter Ciancaglini. Specification

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10). Primary outcome: fermentation simulator. Minimum that keeps the next gate alive: monod.py with the plot.

01

01

Deliverables to commit

  • simulator-design.md: A repeatable trajectory and balance checks exist; any lag-phase behavior is explicitly modeled.
  • telemetry-demo.md: A timestamped sample can be traced from generator to rendered curve.
  • simulation-manifest.csv: Twenty reproducible outputs have known ground truth and no implied plant validation.
  • Bounded learning exercise and personal teach-back.
  • Evidence-backed branding and opportunity pack.
  • Sunday review and next physical action.
↑ Back to top
02

02

Proposed calendar

Day Minutes Physical action / outcome Actual slot Done
Mon 90 Implement X/S/P/DO balances, feed and volume terms, named parameters and units; document the scope of the simplified simulator. Not set [ ]
Tue 90 1 page of notes in notes/bio/B1.md + 5 questions Not set [ ]
Wed 90 Replay simulator measurements through MQTT to a local time-series store and a minimal graph; provide CSV replay if the Debian box is unavailable. Last ten minutes: optional note. Not set [ ]
Thu 90 Notes; numpy re-doing 3 examples Include relevant founder-paper work within this block. Not set [ ]
Fri 90 Generate 20 seeded batches including a labeled feed-stop fault; save configuration, label and generator version. Not set [ ]
Sat 90 Resolve critical spillover; long-form draft if due; sandbox only if done. Not set [ ]
Sun 60 Build log, evidence, gap review, next actions. Not set [ ]
↑ Back to top
03

03

Dependency and capacity check

  • Missing essential inputs: not yet inspected.
  • Human/external dependency, owner and expected date: not yet inspected.
  • Week-specific constraint: A basic Monod model does not automatically produce lag and death phases. Eighty lines is a presentation idea, not a correctness criterion; do not force artificial physiology to match the title.
  • Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
  • Scope to cut first: optional polish/additional examples; preserve scientific validity.
  • If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending. Reviewing model and date: pending.