# Week 30 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: audit readout and validation results.
Minimum that keeps the next gate alive: Complete the contracted audit readout or documented delivery recovery, and preserve any received partner data with provenance.

## Deliverables to commit

- [ ] `audit-final-readout.md`: Complete the contracted audit readout or documented delivery recovery, and preserve any received partner data with provenance.
- [ ] `paper-3-validation-results.md`: Observed versus predicted outcomes and deviations are separate.
- [ ] `case-study-draft.md`: Client claims trace to evidence; publication permission is requested separately.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Complete the audit's three prioritized automation candidates with measured baseline, estimated days saved, uncertainty, cost assumptions and owner. | Not set | [ ] |
| Tue | 90 | One concise applied note, a worked decision/example and unresolved questions. | Not set | [ ] |
| Wed | 90 | Analyze received wet-lab data against the preregistered plan with controls and biological replicate counts; use a computational-only analysis if no data arrived. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Prepare the anonymized case-study draft and Paper 3 figures; audit residual delivery work and author review dates. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Do not force wet-lab results to arrive on schedule. Two major workstreams compete for capacity; prioritize contracted obligations and record research slippage rather than inventing closure.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.