# Week 25 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: trialkit field module.
Minimum that keeps the next gate alive: Generate one design-correct field-trial report end to end and prepare the trialkit release package.

## Deliverables to commit

- [ ] `field-mapping-evaluation.csv`: Generate one design-correct field-trial report end to end and prepare the trialkit release package.
- [ ] `field-analysis-report.md`: Replicates, random effects and design assumptions are explicit; unsupported designs fail clearly.
- [ ] `trialkit-release-checklist.md`: A clean run produces the report and release metadata is ready.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Select versioned public field datasets and map ten target formats into plot/block/treatment/replicate/date/variable schema with unit checks. | Not set | [ ] |
| Tue | 90 | One concise applied note, a worked decision/example and unresolved questions. | Not set | [ ] |
| Wed | 90 | Implement one supported trial design first and estimate treatment effects with intervals; add design-aware mixed models and diagnostics. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | One concise applied note, a worked decision/example and unresolved questions. Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Prepare bilingual HTML/report examples, fake-data reproduction, trialkit v0.1 and Z5 materials. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Two old v4 weeks are compressed here. Prioritize one valid design end-to-end; record any unmet ten-format target and defer image scoring to the parking lot.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.
