# Week 05 commitment

State: UNCONFIRMED. Owner: Peter Ciancaglini. [Specification](./specs.md)

Start date: not set. End date: not set. Available hours: confirm (planned ceiling 10).
Primary outcome: fermlit corpus and schema.
Minimum that keeps the next gate alive: `RELATED.md`. If someone did it already, you must know now.

## Deliverables to commit

- [ ] `related-work.md`: Every citation resolves and the novelty statement follows the evidence.
- [ ] `corpus-protocol.md`: Retrieved, eligible, accessible and included counts are separately reported.
- [ ] `schema-review.md`: Schema distinguishes paper, experiment, missing, not reported, and extraction failed.
- [ ] Bounded learning exercise and personal teach-back.
- [ ] Evidence-backed branding and opportunity pack.
- [ ] Sunday review and next physical action.

## Proposed calendar

| Day | Minutes | Physical action / outcome | Actual slot | Done |
|---|---:|---|---|---|
| Mon | 90 | Verify at least ten related works and decide whether FermLit is a new resource or an extension; record search strings and date. | Not set | [ ] |
| Tue | 90 | Notes; Rosalind problems 1-4 (rosalind.info) | Not set | [ ] |
| Wed | 90 | Pilot the parenthesized Europe PMC query, screen eligibility and acquire up to the 500-paper target with a license-aware manifest. Last ten minutes: optional note. | Not set | [ ] |
| Thu | 90 | LightGBM soft sensor with tuned regularization Include relevant founder-paper work within this block. | Not set | [ ] |
| Fri | 90 | Define experiment-level records and provenance fields; hand-map three papers with multiple conditions; save raw and normalized units. | Not set | [ ] |
| Sat | 90 | Resolve critical spillover; long-form draft if due; sandbox only if done. | Not set | [ ] |
| Sun | 60 | Build log, evidence, gap review, next actions. | Not set | [ ] |

## Dependency and capacity check

- Missing essential inputs: not yet inspected.
- Human/external dependency, owner and expected date: not yet inspected.
- Week-specific constraint: Do not equate search hits with fermentation experiments. Scientific Data claims and company gaps are hypotheses. Freeze paper-level development/test partitions before annotation or prompt tuning.
- Existing session authorization for external actions or spending: not assessed; local planning only at scaffold creation.
- Scope to cut first: optional polish/additional examples; preserve scientific validity.
- If the forecast exceeds available time: record a concrete reduced scope or revised delivery proposal before committing.

Peter's commitment / adjustments: pending.
Reviewing model and date: pending.
